Chronicle of Work

Chronicle of Work

05/30/2023

Suburban Branch

"Kazan – Orenburg” – Rybnaya Sloboda: km 15+258 – km 16+858 (Rybno-Slobodsky district)

Construction of А16Нт asphaltic mix levelling course. Construction of surface course with stone mastics (grade 8). 

05/30/2023

Suburban Branch

"Kazan – Orenburg”- settlement of 25 Oktyabrya state farm - Aleksandrovsky: km 0+000 – km 5+453 (Laishevsky district)

Construction of earthen roadbed, construction of base course using cold recycling method (1st pass).

05/29/2023

Apastovsky Branch

Road maintenance works on local roads in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district) 

05/29/2023

Аrsky Branch

Kazan – Shemordan: km 65+575 – km 67+624 (Tiulyachinsky district)

Construction of surface course with stone mastics (grade 8). 

05/29/2023

Аrsky Branch

Kazan – Shemordan: km 65+575 – km 67+624 (Tiulyachinsky district)

Construction of А16Нт asphaltic mix levelling course. 

05/29/2023

Аrsky Branch

Kazan – Shemordan: km 68+750 – km 70+088 (Tiulyachinsky district)

Construction of levelling course. 

05/29/2023

Apastovsky Branch

Bolshiye Kaibitsy – Bagayevo: km 1+440 – km 2+440 (Kaibitsky district)

Workers of our company conduct construction of surface course with stone mastics (grade 8). 

05/29/2023

Apastovsky Branch

Karatun – Cheremshan – Bolshoye Podberezye: km 0+000 – km 1+100 (Apastovsky district)

Improvement of road parts.

05/27/2023

Аrsky Branch

Road maintenance works on local roads in Arsky district of the Republic of Tatarstan (Arsky district)

Grass mowing with rubber-tyred tractor mower.

05/27/2023

Apastovsky Branch

Access road to Yambulatovo village (Verkhneuslonsky district)

Construction of А16Нн asphaltic mix levelling course is finished. 

05/26/2023

Аrsky Branch

Kazan – Shemordan: km 68+750 – km 70+088 (Tiulyachinsky district)

Milling of old asphaltic surface.

05/26/2023

Buinsky Branch

"Staroye Drozhzhanoye – Tatarskiye Shatrashany” – Gorodische (Drozhzhanovsky district)

Construction of sandy base course (20 cm) and macadam-and-sand subgrade (20 cm, grade С4 М800) on access tracks.

05/26/2023

Apastovsky Branch

Road maintenance works on local roads in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district)

Patching of asphaltic surface is finished.

05/26/2023

Aksubaevsky Branch

Chistopol – Aksubayevo – Nurlat: km 77+957 – km 79+457 (Aksubayevsky district)

Construction of asphalt surface course of stone mastics (grade 8). 

05/25/2023

Аrsky Branch

Ashitbash – Shushmabash – Karaduvan: km 0+043 – km 2+489 (Arsky district)

Milling of asphalted surface.

05/23/2023

Suburban Branch

Kamenka – Dubyazy – Bolshaya Atnya: km 19+965 – km 22+265 (Vysokogorsky district)

Construction of А16Нн asphaltic mix levelling course. Construction of surface course with stone mastics (grade 8). 

05/19/2023

Aksubaevsky Branch

Chistopol – Aksubayevo – Nurlat: km 41+650 – km 46+075 (Aksubayevsky district)

Construction of levelling course with А16Нт asphalt-concrete mix.

05/18/2023

Nizhnekamsky Branch

Naberezhnye Chelny – Zayinsk – Almetyevsk – Nizhnekamsk: km 2+900 – km 3+900 (Tukayevsky district)

Construction of asphalt surface course of stone mastics (grade 16).

05/18/2023

Apastovsky Branch

Maintenance works on local roads in Kamsko-Ustyinsky district (Kamsko-Ustyinsky district) 

05/17/2023

Аrsky Branch

Tiubyak – Chekurcha – Yanga-Sala: km 0+000 - km 1+170 (Arsky district)

Construction of asphalt surface course of stone mastics (grade 8, 0.04 m thick).

05/17/2023

Apastovsky Branch

Road network in Apastovo township: 0+000 - 0+481; 0+000 - 0+716; 0+000 - 0+524; 0+000 - 0+151; 0+000 - 0+209 (Apastovsky district)

Construction of subbase of hot А32Нн asphaltic mix on A. Alisha Street is finished.

05/17/2023

Аrsky Branch

Tiubyak – Chekurcha – Yanga-Sala: km 0+000 - km 1+170 (Arsky district)

Construction of levelling course.

05/16/2023

Apastovsky Branch

Access road to Pobeda village: km 0+000 – km 2+120 (Kaibitsky district)

Stabilization and strengthening of soil with regenerator-mixer with addition of lime.

05/16/2023

Аrsky Branch

М-7 "Volga” – Balandysh: km 6+723 – km 10+000 (Tiulyachinsky district)

Construction of temporary bypass road for the period of full reconstruction of the auto road.

05/16/2023

Аrsky Branch

Kazan – Shemordan: km 78+700 – km 81+678 (Tiulyachinsky district)

Milling of asphalted surface.

05/16/2023

Menzelinsky Branch

"Menzelinsk – Russkiy Karan – Togashevo” – Kuzembetyevo: km 1+030 – km 3+230 (Menzelinsky district)

Construction of levelling course with А16Нн asphalt-concrete mix, construction of asphalt surface course of stone mastics (grade 8).

05/15/2023

Apastovsky Branch

Bolshiye Kaybitsy – Bagayevo: km 1+440 – km 2+441 (Kaibitsky district)

Construction of levelling course with А16Нн asphalt-concrete mix is finished.

05/15/2023

Buinsky Branch

Maintenance works on local roads in Drozhzhanovsky district of the Republic of Tatarstan (Drozhzhanovsky district)

Patching repair on public roads.

05/15/2023

Аrsky Branch

Maintenance works on local roads in Tiulyachinsky district of the Republic of Tatarstan (Tiulyachinsky district)

05/13/2023

Apastovsky Branch

Kazan – Ulyanovsk – Kamskoye Ustye: km 43+854 – km 44+854 (Kamsko-Ustyinsky district)

Widening of the base course to match the grade. 

05/13/2023

Apastovsky Branch

Access road to Yambulatovo village (Verkhneuslonsky district)

Patching repair is finished.

05/12/2023

Suburban Branch

Kazan – Shemordan: km 25+224 – km 25+787; km 26+793 – km 29+780 (Pestrechinsky district)

Cold milling of asphalted surface. Construction of levelling course with А16Нн asphalt-concrete mix.

05/12/2023

Suburban Branch

Kazan – Shemordan: km 33+440 – km 35+100 (Pestrechinsky district)

Cold milling of asphalted surface. Construction of levelling course with А16Нн asphalt-concrete mix.

05/12/2023

Suburban Branch

"Kazan – Orenburg” – Rybnaya Sloboda: km 15+258 – km 16+858 (Rybno-Slobodsky district)

Cold milling of asphalted surface.

05/11/2023

Apastovsky Branch

Road network in Apastovo township: 0+000 - 0+481; 0+000 - 0+716; 0+000 - 0+524; 0+000 - 0+151; 0+000 - 0+209 (Apastovsky district)

Construction of А32Нн base course and surface course of stone mastics (grade 8) is finished.

05/11/2023

Buinsky Branch

Russkiye Kischaky – Koshky – Novotimbayevo: km 0+000 - km 3+874 (Buinsky district)

Soil compacting for subsurface drainage with excavator-mounted hydraulic vibratory tamper.

05/05/2023

Apastovsky Branch

Road network in Apastovo township: 0+000 - 0+481; 0+000 - 0+716; 0+000 - 0+524; 0+000 - 0+151; 0+000 - 0+209 (Apastovsky district)

Construction of levelling base course with С4 М-800 macadam-and-sand mix.

05/05/2023

Sabinsky Branch

“Kazan – Shemordan” - Pimery: km 0+000 – km 5+170 (Pestrechinsky district)

Construction of earth roadbed.

05/05/2023

Mamadyshsky Branch

М-7 "Volga" – Sekines, part Ragozino – Omarskiy Pochinok: km 0+000 – km 3+085 (Mamadyshsky district)

Excavation works in progress.

05/04/2023

Apastovsky Branch

Kazan – Ulyanovsk – Kamskoye Ustye: km 31+598 – km 38+000 (Kamsko-Ustyinsky district)  

Breaking of road surface. 

05/03/2023

Nizhnekamsky Branch

Vakhitova Ave. (from Sobilekovskaya Street to Khimikov Ave. roundabout – to Vakhitov Ave.): km 0+000 – km 1+465 (Nizhnekamsky district)

Cold milling of asphaltic surface.


05/03/2023

Apastovsky Branch