Chronicle of Work05/30/2023 Suburban Branch "Kazan – Orenburg” – Rybnaya Sloboda: km 15+258 – km 16+858 (Rybno-Slobodsky district) Construction of А16Нт asphaltic mix levelling course. Construction of surface course with stone mastics (grade 8). 05/30/2023 Suburban Branch "Kazan – Orenburg”- settlement of 25 Oktyabrya state farm - Aleksandrovsky: km 0+000 – km 5+453 (Laishevsky district)
Construction of earthen roadbed, construction of base course using cold recycling method (1st pass). 05/29/2023 Apastovsky Branch Road maintenance works on local roads in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district) 05/29/2023 Аrsky Branch Kazan – Shemordan: km 65+575 – km 67+624 (Tiulyachinsky district)
Construction of surface course with stone mastics (grade 8). 05/29/2023 Аrsky Branch Kazan – Shemordan: km 65+575 – km 67+624 (Tiulyachinsky district)
Construction of А16Нт asphaltic mix levelling course. 05/29/2023 Аrsky Branch Kazan – Shemordan: km 68+750 – km 70+088 (Tiulyachinsky district)
Construction of levelling course. 05/29/2023 Apastovsky Branch Bolshiye Kaibitsy – Bagayevo: km 1+440 – km 2+440 (Kaibitsky district)
Workers of our company conduct construction of surface course with stone mastics (grade 8). 05/29/2023 Apastovsky Branch Karatun – Cheremshan – Bolshoye Podberezye: km 0+000 – km 1+100 (Apastovsky district)
Improvement of road parts. 05/27/2023 Аrsky Branch Road maintenance works on local roads in Arsky district of the Republic of Tatarstan (Arsky district)
Grass mowing with rubber-tyred tractor mower. 05/27/2023 Apastovsky Branch Access road to Yambulatovo village (Verkhneuslonsky district)
Construction of А16Нн asphaltic mix levelling course is finished. 05/26/2023 Аrsky Branch Kazan – Shemordan: km 68+750 – km 70+088 (Tiulyachinsky district)
Milling of old asphaltic surface. 05/26/2023 Buinsky Branch "Staroye Drozhzhanoye – Tatarskiye Shatrashany” – Gorodische (Drozhzhanovsky district)
Construction of sandy base course (20 cm) and macadam-and-sand subgrade (20 cm, grade С4 М800) on access tracks. 05/26/2023 Apastovsky Branch Road maintenance works on local roads in Verkhneuslonsky district of the Republic of Tatarstan (Verkhneuslonsky district)
Patching of asphaltic surface is finished. 05/26/2023 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: km 77+957 – km 79+457 (Aksubayevsky district)
Construction of asphalt surface course of stone mastics (grade 8). 05/25/2023 Аrsky Branch Ashitbash – Shushmabash – Karaduvan: km 0+043 – km 2+489 (Arsky district)
Milling of asphalted surface. 05/23/2023 Suburban Branch Kamenka – Dubyazy – Bolshaya Atnya: km 19+965 – km 22+265 (Vysokogorsky district)
Construction of А16Нн asphaltic mix levelling course. Construction of surface course with stone mastics (grade 8). 05/19/2023 Aksubaevsky Branch Chistopol – Aksubayevo – Nurlat: km 41+650 – km 46+075 (Aksubayevsky district)
Construction of levelling course with А16Нт asphalt-concrete mix. 05/18/2023 Nizhnekamsky Branch Naberezhnye Chelny – Zayinsk – Almetyevsk – Nizhnekamsk: km 2+900 – km 3+900 (Tukayevsky district)
Construction of asphalt surface course of stone mastics (grade 16). 05/18/2023 Apastovsky Branch Maintenance works on local roads in Kamsko-Ustyinsky district (Kamsko-Ustyinsky district) 05/17/2023 Аrsky Branch Tiubyak – Chekurcha – Yanga-Sala: km 0+000 - km 1+170 (Arsky district)
Construction of asphalt surface course of stone mastics (grade 8, 0.04 m thick). 05/17/2023 Apastovsky Branch Road network in Apastovo township: 0+000 - 0+481; 0+000 - 0+716; 0+000 - 0+524; 0+000 - 0+151; 0+000 - 0+209 (Apastovsky district)
Construction of subbase of hot А32Нн asphaltic mix on A. Alisha Street is finished. 05/17/2023 Аrsky Branch Tiubyak – Chekurcha – Yanga-Sala: km 0+000 - km 1+170 (Arsky district) Construction of levelling course. 05/16/2023 Apastovsky Branch Access road to Pobeda village: km 0+000 – km 2+120 (Kaibitsky district)
Stabilization and strengthening of soil with regenerator-mixer with addition of lime. 05/16/2023 Аrsky Branch М-7 "Volga” – Balandysh: km 6+723 – km 10+000 (Tiulyachinsky district)
Construction of temporary bypass road for the period of full reconstruction of the auto road. 05/16/2023 Аrsky Branch Kazan – Shemordan: km 78+700 – km 81+678 (Tiulyachinsky district)
Milling of asphalted surface. 05/16/2023 Menzelinsky Branch "Menzelinsk – Russkiy Karan – Togashevo” – Kuzembetyevo: km 1+030 – km 3+230 (Menzelinsky district)
Construction of levelling course with А16Нн asphalt-concrete mix, construction of asphalt surface course of stone mastics (grade 8). 05/15/2023 Apastovsky Branch Bolshiye Kaybitsy – Bagayevo: km 1+440 – km 2+441 (Kaibitsky district)
Construction of levelling course with А16Нн asphalt-concrete mix is finished. 05/15/2023 Buinsky Branch Maintenance works on local roads in Drozhzhanovsky district of the Republic of Tatarstan (Drozhzhanovsky district)
Patching repair on public roads. 05/15/2023 Аrsky Branch Maintenance works on local roads in Tiulyachinsky district of the Republic of Tatarstan (Tiulyachinsky district) 05/13/2023 Apastovsky Branch Kazan – Ulyanovsk – Kamskoye Ustye: km 43+854 – km 44+854 (Kamsko-Ustyinsky district)
Widening of the base course to match the grade. 05/13/2023 Apastovsky Branch Access road to Yambulatovo village (Verkhneuslonsky district) Patching repair is finished. 05/12/2023 Suburban Branch Kazan – Shemordan: km 25+224 – km 25+787; km 26+793 – km 29+780 (Pestrechinsky district)
Cold milling of asphalted surface. Construction of levelling course with А16Нн asphalt-concrete mix. 05/12/2023 Suburban Branch Kazan – Shemordan: km 33+440 – km 35+100 (Pestrechinsky district)
Cold milling of asphalted surface. Construction of levelling course with А16Нн asphalt-concrete mix. 05/12/2023 Suburban Branch "Kazan – Orenburg” – Rybnaya Sloboda: km 15+258 – km 16+858 (Rybno-Slobodsky district)
Cold milling of asphalted surface. 05/11/2023 Apastovsky Branch Road network in Apastovo township: 0+000 - 0+481; 0+000 - 0+716; 0+000 - 0+524; 0+000 - 0+151; 0+000 - 0+209 (Apastovsky district)
Construction of А32Нн base course and surface course of stone mastics (grade 8) is finished. 05/11/2023 Buinsky Branch Russkiye Kischaky – Koshky – Novotimbayevo: km 0+000 - km 3+874 (Buinsky district)
Soil compacting for subsurface drainage with excavator-mounted hydraulic vibratory tamper. 05/05/2023 Apastovsky Branch Road network in Apastovo township: 0+000 - 0+481; 0+000 - 0+716; 0+000 - 0+524; 0+000 - 0+151; 0+000 - 0+209 (Apastovsky district)
Construction of levelling base course with С4 М-800 macadam-and-sand mix. 05/05/2023 Sabinsky Branch “Kazan – Shemordan” - Pimery: km 0+000 – km 5+170 (Pestrechinsky district)
Construction of earth roadbed. 05/05/2023 Mamadyshsky Branch М-7 "Volga" – Sekines, part Ragozino – Omarskiy Pochinok: km 0+000 – km 3+085 (Mamadyshsky district) Excavation works in progress. 05/04/2023 Apastovsky Branch
Kazan – Ulyanovsk – Kamskoye Ustye: km 31+598 – km 38+000 (Kamsko-Ustyinsky district) Breaking of road surface.
05/03/2023 Nizhnekamsky Branch Vakhitova Ave. (from Sobilekovskaya Street to Khimikov Ave. roundabout – to Vakhitov Ave.): km 0+000 – km 1+465 (Nizhnekamsky district)
Cold milling of asphaltic surface.
05/03/2023 Apastovsky Branch |