October 2016 - April 201704/27/2017 Suburban Branch Workers of the company conduct pothole repair of regional asphalt-concrete public roads in Rybno-Slobodsky district of the Republic of Tatarstan. 04/27/2017 Apastovsky Branch Workers of Apastovsky branch had started works on site “Reconstruction of the asphalted road network in inhabited localities in Apastovsky district of the Republic of Tatarstan (settlement of Karatunsky grain collecting station, Zur Uram street). 04/26/2017 Apastovsky Branch Construction of leveling course of black macadam on site “Reconstruction of the asphalted road network in inhabited localities in Apastovsky district of the Republic of Tatarstan (Molodezhnaya street). 04/21/2017 Apastovsky Branch Summer road maintenance works are continued on regional and federal roads in Verkhneuslonsky district of the Republic of Tatarstan. 04/18/2017
Workers of Drozhzhanovsky branch had started construction of the road base using cold recycling method on site “Reconstruction of the auto road “Staroye Drozhzhanoye – Karakityan”- Shlanga on km 6+200 – km 9+550 in Drozhzhanovsky municipal district of the Republic of Tatarstan. 04/18/2017 Apastovsky Branch Workers of Apastovsky branch of JSC “Tatavtodor” had started asphalt milling on site “Reconstruction of worn-out surface on the auto road Ulanovo-Karatun on km 48+510 – km 50+170 in Apastovsky district of the Republic of Tatarstan. 04/14/2017
Workers of the company conduct pothole repair of regional asphalt-concrete public roads in Tukayevsky district of the Republic of Tatarstan. 04/13/2017
Workers of the company conduct pothole repair of regional asphalt-concrete public roads in Drozhzhanovsky district of the Republic of Tatarstan. 04/11/2017 Apastovsky Branch Workers of the company continue pothole repair of asphalt-concrete territorial roads in Verkhneuslonsky district of the Republic of Tatarstan. 04/11/2017 Apastovsky Branch Dust and dirt are washed off the metal barrier railings with multipurpose road maintenance machine on federal road Kazan-Buinsk-Ulyanovsk in Apastovsky district of the Republic of Tatarstan. 03/28/2017 Mamadyshsky Branch The workers of the company carry our pothole repair of the asphalt-concrete regional public roads in Mamadyshsky district of the Republic of Tatarstan. 03/20/2017 Suburban Branch Pothole repair using hot asphalt-concrete mix on the auto road “Kazan--Orenburg”. 02/27/2017 Apastovsky Branch Workers of the company conduct winter maintenance works on the auto roads of Apastovsky, Buinsky, Verkhneuslonsky and Kamsko-Ustyinsky districts of the Republic of Tatarstan. 02/18/2017 Menzelinsky Branch Winter maintenance works are conducted on the auto roads of the republic. 02/15/2017 Suburban Branch On photos: new combined road maintenance machine on chassis Volvo V40-01 at work during public federal and regional roads maintenance in Pestrechinsky district of the Republic of Tatarstan. The machine is equipped with frontal and side ploughs, Epoke anti-ice precision sprayers, which allow to disperse liquid deicing agents as well. 01/20/2017 Menzelinsky Branch Workers of the company conduct winter road maintenance works. 01/19/2017 Аrsky Branch Road signs are being installed in accordance with the instructions of State Road Traffic Safety Inspection of the Ministry of the Interior of the Republic of Tatarstan. 01/12/2017 Aksubaevsky Branch Workers of the company conduct winter road maintenance works on the automobile roads of Aksubayevsky municipal district of the Republic of Tatarstan. 01/05/2017 Apastovsky Branch Workers of the company conduct winter road maintenance works on the automobile roads of Apastovsky, Buinsky, Kamsko-Ustyinsky and Tetiushsky districts of the Republic of Tatarstan. 12/28/2016 Apastovsky Branch Workers of the company conduct winter road maintenance works. 12/27/2016 Аrsky Branch Workers of the company remove the snow off the roadsides. 12/21/2016 Suburban Branch Winter road maintenance works are conducted on the public federal auto road Kazan-Orenburg. 12/17/2016 Menzelinsky Branch Winter road maintenance works are conducted. 12/16/2016
Winter road maintenance works are conducted. 12/16/2016 Suburban Branch Workers of our company remove the snow from the divisor on the auto road M-7 “Volga”. 12/15/2016 Apastovsky Branch Winter road maintenance works are conducted on the federal auto roads in Apastovsky municipal district of the Republic of Tatarstan. 12/14/2016 Apastovsky Branch Winter road maintenance works are continued on the federal auto roads in Verkhneuslonsky municipal district of the Republic of Tatarstan. 12/13/2016 Nizhnekamsky Branch Winter road maintenance works are conducted. 12/03/2016 Suburban Branch Winter road maintenance works are conducted on the public federal auto road Kazan-Orenburg. 12/01/2016 Aksubaevsky Branch Winter road maintenance works are conducted. 11/30/2016 Mamadyshsky Branch Winter road maintenance works are conducted. 11/25/2016 Suburban Branch Snow shields are installed along the automobile roads of Vysokogorsky district of the Republic of Tatarstan. 11/22/2016
Maintenance activities are conducted on the auto roads. 11/21/2016 Aksubaevsky Branch Maintenance activities are conducted on the auto roads. 11/16/2016 Mamadyshsky Branch After heavy snowfalls, the snow is removed from the divisor on the auto road M-7 “Volga”. 10/29/2016 Menzelinsky Branch The works are being finished on site “Reconstruction of the auto road M-7 “Volga” – Novoye Aymanovo – Atryakle – Kaltakovo – Filimonovka , part Chupayevo – Atryakle in Menzelinsky municipal district of the Republic of Tatarstan”. 10/27/2016 Aksubaevsky Branch The works are being finished on site “Reconstruction of the auto road Drive to settlement Tuymetkino in Cheremshansky municipal district of the Republic of Tatarstan”. 10/27/2016 Aksubaevsky Branch The works are being finished on site “Reconstruction of the auto road “Kuzaykino-Nurlat”, part km 22+725 – km 26+355 (1st stage: km 24+420 - km 26+355) in Cheremshansky municipal district of the Republic of Tatarstan”. 10/26/2016 Aksubaevsky Branch The works are finished on site “Normalization of the route “Krivoozerki – Novaya Aleksandrovka – Nizhnyaya Balanda in Aksubayevsky municipal district of the Republic of Tatarstan”. 10/25/2016 Aksubaevsky Branch The works are finished on site “Reconstruction of the auto road “Chistopol – Aksubayevo – Nurlat” – Urmandeyevo, part km 0+000 – km 6+100 in Aksubayevsky municipal district of the Republic of Tatarstan”. 10/25/2016 Menzelinsky Branch The works are finished on site “Reconstruction of the auto road “Tiukovo – Tatarskaya Yamaly”, part Bulyak – Tatarskiye Yamaly in Aktanyshsky municipal district of the Republic of Tatarstan”. 10/22/2016 Apastovsky Branch The works are finished on site “Reconstruction of the auto road “Kazan – Ulyanovsk” – Kamskoye Ustye, part km 15+200 – km 22+500 in Verkhneuslonsky municipal district of the Republic of Tatarstan”. 10/20/2016 Aksubaevsky Branch The reconstruction of the road network in township Aksubayevo in Aksubayevsky municipal district of the Republic of Tatarstan is finished. 10/19/2016 Apastovsky Branch The works are finished on site “Reconstruction of the auto road “Kazan – Ulyanovsk” – Kamskoye Ustye, part km 0+717 – km 2+028 and km 22+500 – km 24+084 in Verkhneuslonsky municipal district of the Republic of Tatarstan”. 10/18/2016 Apastovsky Branch Construction of asphalt-concrete pavement is finished on site “Reconstruction of the auto road “Ulanovo – Tenki” – Osinniky in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan”. 10/17/2016 Suburban Branch The works are going on on site “Reconstruction of the auto road “Drive to Rybnaya Sloboda quay”, part 0+000 km – 2+000 km in Rybno-Slobodsky municipal district of the Republic of Tatarstan”. 10/16/2016 Apastovsky Branch 10/14/2016 Aksubaevsky Branch The works (on part km 62+000 – km 66+700) are finished on site “Reconstruction of the auto road Chistopol-Aksubayevo-Nurlat, part km 62+000 - km 69+657, in Aksubayevsky municipal district of the Republic of Tatarstan”. 10/13/2016 Aksubaevsky Branch The works are finished on site “Reconstruction of the auto road “Aksubayevo-Fedorovka” – Novoye Ibraykino, part km 9+432 - km 20-237 in Aksubayevsky municipal district of the Republic of Tatarstan”. 10/10/2016 Mamadyshsky Branch Worn-out layers of asphalt-concrete surface are being reconstructed on the auto road M-7 “Volga”, part km 923 (crossroads) using GRABER thermal containers for asphalt-concrete mix transportation. 10/07/2016 Suburban Branch Constrcution of asphalt-concrete surface is almost finished on site “Reconstruction of the auto road Kornoukhovo-Novaya Yrga-Shetnevo-Tulushi, part Novaya Yrga-Shetnevo-Tulushi in Rybno-Slobodsky municipal district of the Republic of Tatarstan”. 10/06/2016 Aksubaevsky Branch The construction of road facilities is finished on site “Reconstruction of the auto road “Aksubayevo-Fedorovka”, part km 0+000 - km 1+685 in Aksubayevsky municipal district of the Republic of Tatarstan”. 10/06/2016 Аrsky Branch Construction of the surface asphaltic layer on site “Reconstruction of worn-out asphaltic surfaces on the auto road “M-7 “Volga” –Balandysh”, part km 18+475 – km 20+065 in Tulyachinsky municipal district of the Republic of Tatarstan”. 10/06/2016 Аrsky Branch The works are being finished on site “Reconstruction of the auto road “Shadky – Bolshiye Mereteki” in Tulyachinsky municipal district of the Republic of Tatarstan”. 10/05/2016 Sabinsky Branch Construction of the macadam-and-sand bedding and asphalt-concrete bottom layer on site “Reconstruction of the auto road Bogatye Saby – Timershik – Verkhniy Simet – Alan, part km 3+500 – km 6+330 in Sabinsky municipal district of the Republic of Tatarstan”. 10/03/2016 Аrsky Branch The slopes are strengthened with macadam on site “Reconstruction of the auto road M-7 “Volga”- Shadky-Saush-Sharmashy”, part “Saush-Shadky” in Tulyachinsky district of the Republic of Tatarstan”. 10/03/2016 Аrsky Branch Metal barrier railings are constructed on the “Arsk-Tulyachy-B. Shinar” auto road in Sabinsky district of the republic. 10/01/2016 Menzelinsky Branch The works are being finished on site “Reconstruction of the auto road “Aktanysh-Musliumovo”, part 60+883 km – 61+453 km in Musliumovsky municipal district of the Republic of Tatarstan”. 10/01/2016 Menzelinsky Branch The works are finished on site “Reconstruction of the auto road “Tiukovo-Tatrskiye Yamaly” part Bulyak-Tatarskiye Yamaly in Aktanyshsky municipal district of the Republic of Tatarstan”. |