Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season

Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season

10-10-2022

“Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season “seminar was held on October 7, 2022 in Aksubayevsky branch of JSC “Tatavtodor”. Chief engineers and mechanics of company branches and construction sites mechanics participated in the seminar and discussed the following issues:

- reasons for batteries outage, maintenance safety rules;

- small-scale mechanization equipment lay-up, frequent operational mistakes;

- administrative violations and their effects;

- paints storage requirements, expiry dates, preparation of equipment for painting, and paint matching;

- expiration of unpacked oils, application and lubrication points on KamAZ, Amkodor, MTZ, auto grader and other equipment;

- operational features, preventive repair, early detection of equipment defects, operational features of KDM ED500AK special equipment;

- storekeeping of tyres, tyre marks explanation, measurements of residual tread heights, frequent tyre usage mistakes.

Layer from JSC “Tatavtodor” and specialists from TD RADIAN LLC, MERCATOR OOO, MOTOR MASTER LLC, AVTOKHIMSERVIS LLC, PILKA.PRO LLC, COLOR PLUS LLC, AND ALFA-S LLC participated in the seminar.

Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season
Seminar: Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season

Back to the list