RAU-8 ASPHALT-CONCRETE MIX: NOW IN SABY

RAU-8 ASPHALT-CONCRETE MIX: NOW IN SABY

08-09-2021

Experimental RAU-8 asphalt mix was applied at production base of Sabinsky branch of JSC “Tatavtodor”. The mix contains polymer modified bitumen based on non-oxidized bitumen, i.e. bitumen residue from oil refinery, that is not subject to air oxidation. Polymer modified bitumen was produced in Kazan.

The aim of the experiment is to compare characteristics of new PMB surface and standard bitumen (БНД 70/100).    

RAU-8 ASPHALT-CONCRETE MIX: NOW IN SABY
RAU-8 ASPHALT-CONCRETE MIX: NOW IN SABY
RAU-8 ASPHALT-CONCRETE MIX: NOW IN SABY

Back to the list