"Preparation of road construction machinery and vehicles for 2026-2027 autumn-winter construction season" seminar

"Preparation of road construction machinery and vehicles for 2026-2027 autumn-winter construction season" seminar

27-10-2026

“Preparation of road construction machinery and vehicles for 2026-2027 autumn-winter construction season” seminar was held on October 23, 2026 in Sabinsky branch of JSC “Tatavtodor”. Chief engineers and mechanics of company branches and construction sites mechanics participated in the seminar and discussed the following issues: 

- specific aspects of exploitation, preventive repair, early detection of equipment defects, operational features of ED500AK (ED500K) special equipment mounted on KAMAZ-65115 chassis;

- specific aspects of operation and equipment diagnostics for early detection of malfunctions. Main causes of failure in AutoGraf and VTD units. Standard procedures for placing vehicles into long-term storage and returning them to active service;

- administrative violations and their effects; procedures and necessary documents in case of traffic accidents;

- early battery outage; common mistakes in batteries exploitation in winter/summer seasons;

- exploitation of tyres in winter season, early detection of tyres defects.

 Specialists from the following companies participated in the seminar:

  1. OOO "MOTOR MASTER";
  2. OOO “MERCATOR HOLDING”;
  3. OOO "TRANS GLONASS";
  4. OOO "TD RADIAN";
  5.  lawyer of JSC “TATAVTODOR”;
  6.  OOO“KAZAN-SHINTORG”.


Back to the list