09/28/2018

Nizhnekamsky Branch

Construction works are finished on site “Access road to non-commercial allotment gardens “Veteran”, “Sputnik”, “Energetik-1”, allotments “Kama-2”, “Kama”, “Teploenergostroy”, “Stroitel”, “City non-commercial allotment of Nizhnekamsk”, gardening cooperative “Sadovod-NK”, gardening consumer’s cooperatives “Neftekhimik”, “Shinnik” in Nizhnekamsky municipal district of the Republic of Tatarstan”.

09/28/2018

Suburban Branch

Stabilization of soil with lime on site “Reconstruction of the auto road Laishevo-Kurmanakovo, part km 7+881 – km 12+466 in Laishevsky municipal district of the Republic of Tatarstan”.

09/28/2018

Nizhnekamsky Branch

Construction works according to the program “Reconstruction of the road network in the inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan” are finished in Bagodatnoye village (Mira street), Sredniye Chelny village (Pushkina street), Yelantovo settlement (Oktyabrskaya street), Klyatle village (Tsentralnaya street).

09/28/2018

Nizhnekamsky Branch

Workers of the company conduct construction of the asphalt-concrete surface layer on site “Reconstruction of the auto road Naberezhnye Chelny – Zainsk – Almetyevsk, part km 23+840 – km 26+910 in Zainsky municipal district of the Republic of Tatarstan”.

09/27/2018

Suburban Branch

Workers of the company are finishing construction on site “Reconstruction of the auto road Alat-Kazaklar, part km 0+000 – km 2+329 in Vysokogorsky municipal district of the Republic of Tatarstan”.

09/26/2018

Аrsky Branch

Works are finished on site “Reconstruction of the auto road Kamenka-Dubyazy-Bolshaya Atnya, part km 47+295 – km 49+295 in Atninsky municipal district of the Republic of Tatarstan”.

09/24/2018

Sabinsky Branch

Construction of the bottom course of the asphalt-concrete surface is finished on site “Reconstruction of the auto road Sulya – settlement of Korsa railroad passing in Sabinsky municipal district of the Republic of Tatarstan” (4.580 km).

09/24/2018

Suburban Branch

Works are finished on site “Construction of Access auto road to Bolshoy Pochinok village in Vysokogorsky municipal district of the Republic of Tatarstan”.

09/24/2018

Nizhnekamsky Branch

Reconstruction of “Sobolekovskaya” auto road in Nizhnekamsk city, Nizhnekamsky municipal district of the Republic of Tatarstan. Construction of the bottom course of the auto road.

09/24/2018

Apastovsky Branch

Works are being finished on site “Reconstruction of the auto road Biuyrgany – settlement of Burunduky railroad station in Buinsky municipal district of the Republic of Tatarstan (stage 1)”.

09/22/2018

Apastovsky Branch

Workers of the company conduct construction of site “Reconstruction of the road network of the inhabited localities of Verkhneuslonsky municipal district of the Republic of Tatarstan (transitional type of surface)" (Yanga Iul settlement: stabilization of soil with lime, construction of road surface of macadam-and-sand mix).

09/22/2018

Apastovsky Branch

Reconstruction of worn-out surfaces is finished on the auto road Tetiushi-Bolshiye Tarkhany – Undory, part km 42+348 – km 43+480 in Tetiushsky municipal district of the Republic of Tatarstan.

09/22/2018

Apastovsky Branch

Construction is finished on the auto road Tetiushi-Kamskoye Ustye, part km 2+300 – km 11+800 in Tetiushsky municipal district of the Republic of Tatarstan.

09/22/2018

Sabinsky Branch

Workers of the company conduct construction of the road base course of macadam and sand mix (grade M-800) on site “Reconstruction of the auto road Sulya-settlement of Korsa railroad passing in Sabinsky municipal district of the Republic of Tatarstan”.

09/21/2018

Аrsky Branch

Workers of the company construct asphalt-concrete bedding course on site “Construction of the auto road “Arsk-Bolshaya Atnya” – Stariy Kishit in Arsky and Atninsky municipal districts of the Republic of Tatarstan”.

09/15/2018

Apastovsky Branch

Reconstruction of worn-out layers is finished on the auto road Ulanovo-Karatun (part km 2+293 - km 4+493) in Verkhneuslonsky municipal district of the Republic of Tatarstan.

09/15/2018

Apastovsky Branch

Works are finished on the auto road Ulanovo-Karatun (part km 4+493 - km 6+699) in Verkhneuslonsky municipal district of the Republic of Tatarstan.

09/14/2018

Mamadyshsky Branch

Reconstruction works are finished on the auto road “Uzyak – Alga – Petrovsky” in Tiulyachinsky municipal district of the Republic of Tatarstan.

09/14/2018

Mamadyshsky Branch

Workers of the company conduct construction of the asphalt bedding course on site “Reconstruction of the auto road M-7 “Volga” – Kutlu Bukash – Rybnaya Sloboda, part km 15+600 – km 18+353 in Rybno-Slobodsky municipal district of the Republic of Tatarstan”.

09/11/2018

Aksubaevsky Branch

Workers of the company are finishing construction on the auto road Kuzaykino – Nurlat – Cheremshan, part km 6+780 – km 10+085 (3rd stage) in Cheremshansky municipal district of the Republic of Tatarstan.

09/11/2018

Aksubaevsky Branch

Workers of the company are finishing construction on the auto road Kuzaykino – Nurlat, part km 36+550 – km 38+600 in Cheremshansky municipal district of the Republic of Tatarstan.

09/11/2018

Aksubaevsky Branch

Workers of the company are finishing construction on the auto road Kuzaykino – Nurlat, part km 22+725 – km 24+420 (2nd stage) in Cheremshansky municipal district of the Republic of Tatarstan.

09/11/2018

Aksubaevsky Branch

Reconstruction of worn-out surfaces is finished on the auto road Azeyevo-Cheremshan-Shentala, part km 57+451 – km 59+447 in Cheremshansky municipal district of the Republic of Tatarstan.

09/11/2018

Mamadyshsky Branch

Construction of asphalt-concrete mix surface on the public federal auto road “M-7 “Volga” – Moscow – Vladimir – Nizhniy Novgorod – Kazan – Ufa”, (part km 978+000 – km 978+900).

09/08/2018

Menzelinsky Branch

Reconstruction of the auto road “Aktanysh – Musliumovo” (part km 69+715 – km 73+715, length: 4.0 km, cat. IV) is finished in Menzelinsky municipal district of the Republic of Tatarstan.

09/08/2018

Menzelinsky Branch

Workers of the company are finishing construction works on site “Reconstruction of the auto road “M-7 Volga – Noviy Melken” in Menzelinsky municipal district of the Republic of Tatarstan».

09/08/2018

Menzelinsky Branch

Constrcution site “Reconstruction of the auto road “M-7 Volga” – Usy“ in Aktanyshsky municipal district of the Republic of Tatarstan". Construction of pavement layers of the auto road.

09/08/2018

Menzelinsky Branch

Construction of the asphaltic base course is finished on site “Reconstruction of the auto road (3.2 km) Staroye Kurmashevo – Shabizbash in Aktanyshsky municipal district of the Republic of Tatarstan».

09/05/2018

Mamadyshsky Branch

Workers of the company conduct construction of waterpies on site “Reconstrcution of the auto road Uzyak-Alga-Petrovsky in Tiulyachinsky municipal district of the Republic of Tatarstan".

09/05/2018

Suburban Branch

Restoration works are being conducted on site “Construction of the auto road Access road to Bolshoy Pochinok village in Vysokogorsky municipal district of the Republic of Tatarstan”.

09/05/2018

Suburban Branch

Workers of the company conduct strengthening of pipes on site “Reconstruction of the auto road Sokury-Kirby-Travkino, part km 5+000 – km 6+000 in Laishevsky municipal district of the Republic of Tatarstan”.

09/05/2018

Suburban Branch

Strengthening of roadsides with macadam and strengthening of pipes are being conducted on site “Reconstruction of the auto road Sredneye Devyatovo – Tatarskiy Yantyk, part km 8+800 – km 11+121 in Laishevsky municipal district of the Republic of Tatarstan”.

09/03/2018

Suburban Branch

Works are finished on site “Reconstruction of the auto road Kazan-Malmyzh, part km 19+320 – km 21+920 in Vysokogorsky municipal district of the Republic of Tatarstan”.

09/03/2018

Suburban Branch

Works are finished on site “Auto road Kazan-Malmyzh, part km 21+920 – km 24+951 (reconstruction of worn-out surfaces) in Vysokogorsky municipal district of the Republic of Tatarstan”.

08/31/2018

Sabinsky Branch

Workers of the company conduct construction of the surface course of the asphalt-concrete surface on site “Reconstruction of the auto road Bogatye Saby –Timershik-Verkhniy Simet –Alan, part km 22+620 – km 24-935 in Sabinsky municipal district of the Republic of Tatarstan”.

08/27/2018

Apastovsky Branch

Workers of Apastovsky branch of JSC “Tatavtodor” conduct reconstruction of worn-out surfaces on the federal auto road “Kazan-Buinsk-Ulyanovsk”, part km 53+700 – km 54+600.

08/27/2018

Apastovsky Branch

Reconstruction works are conducted on site “Reconstruction of the auto road “Ulanovo-Karatun, part km 4+493 – km 6+669 in Verkhneuslonsky municipal district of the Republic of Tatarstan”.

08/27/2018

Apastovsky Branch

Strengthening of steel-concrete pipe canal is conducted on site “reconstruction of the auto road Biurgany-Burunduki railroad station platform in Buinsky municipal district of the Republic of Tatarstan (1st stage)”.

08/27/2018

Apastovsky Branch

Workers of the company conduct stabilization of soil with lime and construction of macadam-and-sand mix surface (intermediate type) in the Yanga Yul inhabited locality in accordance with the program “Reconstruction of the road network in the inhabited localities of Verkhneuslonsky municipal district of the Republic of Tatarstan”.

08/25/2018

Suburban Branch

Installation of auto pavilions on site “Reconstruction of the auto road Rybnaya Sloboda-Yanchikovo in Rybno-Slobodsky municipal district of the Republic of Tatarstan” (2nd stage).

08/24/2018

Apastovsky Branch

Workers of the company continue summer maintenance works on the public auto roads in Verkhneuslonsky municipal district of the Republic of Tatarstan.

08/24/2018

Construction of the surface course of macadam-and-mastics asphalt (grade 10) on site “Reconstruction of the auto road “Kazan-Ulyanovsk”- Staroye Drozhzhanoye, part km 7+000 -km 9+248 in Drozhzhanovsky municipal district of the Republic of Tatarstan.

08/24/2018

Workers of the company conduct improvement works at production base of asphalt-concrete plant of Drozhzanovsky branch of JSC “Tatavtodor”.

08/23/2018

Suburban Branch

Strengthening of the roadsides with macadam on site “Reconstruction of the auto road Sokury-Kirby-Travkino, part km 5+000 -km 6+000 in Laishevsky municipal district of the Republic of Tatarstan.

08/23/2018

Suburban Branch

Summer auto road maintenance works on the public roads of Vysokogorsky, Laishevsky, Pestrechinsky and Rybnoslobodsky municipal districts of the Republic of Tatarstan.

08/20/2018

Sabinsky Branch

Workers of the company conduct construction of macadam-and-sand road bed on site “Reconstruction of the auto road Bogatye Saby- Timershik- Verkhniy Simet-Alan, km 22+620-km 24+935 in Sabinsky municipal district of the Republic of Tatarstan”.

08/19/2018

Menzelinsky Branch

Construction of surface course of asphalt-concrete road is conducted on site “Reconstruction of the auto road Musliumovo-Staroye Saitovo, part Semyakovo-Staroye Saitovo in Musliumovsky municipal district of the Republic of Tatarstan”.

08/19/2018

Menzelinsky Branch

Construction of surface course of macadam and mastics grade 5 (length 1.116 km, width 4.5 meters) is finished on site “Reconstruction of the access road to Nizhneye Yakhseyevo in Aktanyshsky municipal district of the Republic of Tatarstan”.

08/19/2018

Menzelinsky Branch

Workers of the company are finishing construction works on site “Reconstruction of the auto road Aktanysh-Musliumovo, part km 69+715 - km 73+715 in Musliumovsky municipal district of the Republic of Tatarstan”.

08/19/2018

Aksubaevsky Branch

Workers of the company conduct stabilization of soil with lime and construction of the road bed on site “Reconstruction of the auto road Aksubayevo-Yemelkino, part km 7+412- km 16+700 in Aksybayevsky municipal district of the Republic of Tatarstan".

08/18/2018

Аrsky Branch

Laying of the bottom course of the asphalted surface is conducted on site “Reconstruction of the auto road Kamenka-Dubyazy-Bolshaya Atnya, part km 47+295 - km 49+295 in Atninsky municipal district of the Republic of Tatarstan".

08/16/2018

Aksubaevsky Branch

Construction of the asphalted surface with macadam-and-mastics asphalt grade 10 on the auto road Kuzaykino- Nurlat- Cheremshan, part km 6+780 -km 13+765 (III stage, km 6+780 - km 10+040) in Cheremshansky municipal district of the Republic of Tatarstan.

08/15/2018

Nizhnekamsky Branch

Works are finished on site “Reconstruction of the asphalted road network in the inhabited localities in Nizhnekasky municipal district of the Republic of Tatarstan” (auto road from Lesnaya street to Krasniy Kliuch settlement).

08/15/2018

Menzelinsky Branch

Workers of the company conduct liquidation of rutted track on the “M-7 Volga” auto road, part km 1079+000 - km 1081+000 in Menzelinsky municipal district of the Republic of Tatarstan.

08/13/2018

Suburban Branch

Construction of the bottom layer of asphalted surface on site “Reconstruction of the auto road Sredneye Devyatovo- Tatarskiy Yantyk, part km 8+800 - km 11- 121” in Laishevsky municipal district of the Republic of Tatarstan.

08/13/2018

Suburban Branch

Reconstruction of worn-out surfaces is finished on site “Auto road M-7 “Volga” -Kulayevo-Pestretsy, km 0+000 - km 2+100 and km 2+100 - km4+346” in Pestrechinsky municipal district of the Republic of Tatarstan.

08/11/2018

Suburban Branch

Construction of the upper course of macadam-and-mastics grade 10 on site “Reconstruction of the auto road Sokury-Kirbi-Travkino, part km 5+000- km 6+000 in Laishevsky municipal district of the Republic of Tatarstan".

08/10/2018

Apastovsky Branch

Workers of the company conduct construction of the sand road bed and 20 cm thick bottom layer made of macadam-and-sand mix grade C4M800 on site “Reconstruction of the auto road Ulanovo-Karatun, part km 4+493- km 6+699 in Verkhneuslonsky municipal district of the Republic of Tatarstan”.

08/10/2018

Apastovsky Branch

Construction of the upper course of macadam-and-mastics asphalt grade 15 and adding of soil to roadsides on the auto road “Tetiushi-Kamskoye Ustye”, part km 2+300- km 11+800 (IV stage, km 9+855 - km 11+843 in Tetiushsky municipal district of the Republic of Tatarstan.

08/10/2018

Apastovsky Branch

Workers of the company conduct construction of the sand road bed and bottom layer made of macadam-and-sand mix on site “Reconstruction of the auto road Biurgany-settlement of Burunduki railroad station in Buinsky municipal district of the Republic of Tatarstan” (stage 1).

08/10/2018

Apastovsky Branch

Construction of roadsides with macadam grade M-400 size 20-70 mm on site “Reconstruction of worn-out layers on the auto road Bolshiye Kaybitsy- Kamylovo, part km 1+905- km 3+065 in Kaybitsky municipal district of the Republic of Tatarstan”.

08/10/2018

Apastovsky Branch

Workers of Apastovsky branch of JSC “Tatavtodor” had started cutting on the part of the federal auto road “Kazan-Buinsk-Ulyanovsk” in Apastovsky municipal district of the Republic of Tatarstan”.

08/10/2018

Suburban Branch

Construction of the road bed using cold regeneration method with addition of macadam on site “Reconstruction of the auto road Alat-Kazaklar, part km 0+000- km 2+329 in Vysokogorsky municipal district of the Republic of Tatarstan”.

08/10/2018

Nizhnekamsky Branch

Workers of the company conduct construction of the upper layer of macadam-and-mastics asphalt grade 10 on site “Reconstruction of the asphalted road network in the inhabited localities of Nizhnekansky municipal district of the Republic of Tatarstan (auto road on Lesnaya street to Krasniy Kliuch settlement)”.

08/09/2018

Apastovsky Branch

Summer road maintenance is continued on the auto roads in Buinsky and Kamsko-Ustyinsky municipal districts of the Republic of Tatarstan.

08/09/2018

Aksubaevsky Branch

Construction of the 6 cm thick bottom layer of asphalted surface of porous coarse-grained asphalt-concrete mix M-II on site “Kuzaykino-Nurlat-Cheremshan, part km 6+780 -km 13+765 (3rd stage, km 6+780 -km 10+040)” in Cheremshansky municipal district of the Republic of Tatarstan.

08/06/2018

Suburban Branch

Construction of the upper course of the road on site “Reconstruction of the auto road Kazan-Orenburg- Pelevo, part km 0+000 - km 3 3+860” in Laishevsky municipal district of the Republic of Tatarstan”.

08/06/2018

Suburban Branch

Construction of worn-out surfaces is finished on site “Reconstruction of the auto road Stolbistche- Atabayevo, part km 6+000 - km 9+000” in Laishevsky municipal district of the Republic of Tatarstan”.

08/03/2018

Suburban Branch

Construction of dump slopes on site “Reconstruction of the auto road Sokury-Kirby-Travkino, part km 5+000 - km 6+000” in Laishevsky municipal district of the Republic of Tatarstan”.

08/03/2018

Suburban Branch

Construction of the road base course using cold regeneration method (1st pass) on site “Reconstruction of the auto road Alat-Kazaklar, part km 0+000 - km 2+329” in Vysokogorsky municipal district of the Republic of Tatarstan”.

07/30/2018

Construction of asphalt base course is conducted on site “Reconstruction of the auto road Staroye Drozhzhanoye – Tatarskiye Shatrashany, part 12+800 – km 15+360 in Drozhzhanovsky municipal district of the Republic of Tatarstan".

07/30/2018

Mamadyshsky Branch

Workers of the company conduct laying of macadam-and-mastics asphalt surface course (grade 10) on the auto road “Mamadysh-Kukmor”, part km 18+500 – km 21+040 in Mamadyshsky municipal district of the Republic of Tatarstan.

07/30/2018

Menzelinsky Branch

Construction of the asphalt-concrete base course is finished on site “Reconstruction of the access road to Nizhneye Yashkheyevo village” in Aktanyshsky municipal district of the Republic of Tatarstan.

07/30/2018

Nizhnekamsky Branch

Works successfully finished on site “Reconstruction of the asphalted road network in the inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (auto road on Muradyan street from “Shifaly” bus stop to Lesnaya str.).

07/30/2018

Nizhnekamsky Branch

Workers of the company construct surface course of macadam-and-mastics mix (grade 5) in Blagodatnoye village, Mira street, in accordance with the program “Reconstruction of the asphalted road network in the inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (transition type of surface)".

07/26/2018

Nizhnekamsky Branch

Construction of the surface course (macadam-and-mastics asphalt grade 20) and strengthening of roadsides with macadam (grade 400) are finished on site “Reconstruction of the auto road Zainsk-Sukharevo, part km 28+600 - km 32+600 (2nd stage, km 28+600 - km 31+075) in Nizhnekamsky municipal district of the Republic of Tatarstan».

07/25/2018

Aksubaevsky Branch

Construction of the surface course of macadam-and-mastics mix (grade 10) on the auto road “Chistopol-Aksubayevo-Nurlat”, part km 72+566 – km 74+921 and km 77+776 – 78+569 in Aksubayevsky municipal district of the Republic of Tatarstan.

07/25/2018

Aksubaevsky Branch

Construction of the asphalted surface 5 cm thick of macadam-and-mastics mix grade 20 on the auto road “Kuzaykino-Nurlat, part km 36+550 – km 38+600 in Cheremshansky municipal district of the Republic of Tatarstan.

07/24/2018

Mamadyshsky Branch

Workers of the company conduct soil stabilization works (with addition of lime) on site “Reconstruction of the auto road “Uzyak-Alga-Petrovsky” in Tiulyachinsky municipal district of the Republic of Tatarstan.

07/24/2018

Recycling works with addition of cement are finished on site “Reconstruction of the auto road “Staroye Drozhzhanoye – Tatarskiye Shatrashany, part km 12+800 – km 15+360” in Drozhzhanovsky municipal district of the Republic of Tatarstan.

07/16/2018

Aksubaevsky Branch

Construction of base course of asphalt-concrete surface (material used: 7 cm thick porous coarse-grained asphalt-concrete mix, grade M-II) on the auto road “Kuzaikino – Nurlat”, part km 36+550 – km 38+600 in Cheremshansky municipal district of the Republic of Tatarstan.

07/13/2018

Workers of the company construct upper surface layer of macadam-and-mastics asphalt grade 10 on site “Reconstruction of Vakhitov ave. from Chulman ave. to Suumbike ave., Naberezhnye Chelny city”.

07/13/2018

Apastovsky Branch

Construction of road bed using cold recycling method with addition of mineral aggregate (M-800 macadam grade 20-70 mm) on site “Reconstruction of the auto road “Tetiushi-Kamskoye Ustye”, part km 24+140 – km 26+900 in Kamsko-Ustyinsky district of the Republic of Tatarstan.

07/12/2018

Apastovsky Branch

Workers of the company construct bottom layer of porous coarse-grained asphaltic surface and strengthen the slopes on site “Reconstruction of the auto road Biurgany – settlement of Burunduki railroad station in Buinsky municipal district of the Republic of Tatarstan (1st stage)”.

07/12/2018

Apastovsky Branch

Reconstruction of worn-out layers of asphalt is conducted on the auto road “Bolshiye Kaibitsy – Kamylovo”, part km 1+905 – km 3+065 in Kaibitsky municipal district of the Republic of Tatarstan.

07/12/2018

Workers of the company conduct construction of road bed using cold recycling method with addition of mineral aggregate (M-800 macadam grade 20-70 mm) on site “Reconstruction of the auto road “Staroye Drozhzhanoye – Tatarskiye Shatrashany”, part km 12+800 – km 15+360 in Drozhzhanovsky municipal district of the Republic of Tatarstan.

07/12/2018

Apastovsky Branch

Workers of the company conduct summer road maintenance works on the federal and regional public auto roads in Buinsky, Verkhneuslonsky and Kaibitsky municipal districts of the Republic of Tatarstan.

07/12/2018

Apastovsky Branch

Workers of the company continue surfacing works on site “Reconstruction of the auto road Biurgany - settlement of Burunduki railway station in Buinsky municipal district of the Republic of Tatarstan (stage1)”.

07/12/2018

Apastovsky Branch

Improvements on the production base of Kamsko-Ustyinsky maintenance depot of Apastovsky branch of JSC “Tatatvtodor”: asphalted surface course was constructed.

07/11/2018

Apastovsky Branch

Workers of Apastovsky branch of JSC “Tatavtodor” have started milling of asphalted surface on site “Auto road Ulanovo-Karatun, part km 2+293 - km 4+493 in Verkhneuslonsky municipal district of the Republic of Tatarstan (reconstruction of worn-out surfaces)".

07/10/2018

Menzelinsky Branch

Site “Construction of the auto road “M-7 “Volga” – Noviy Melken” – Dusai-Kichu in Menzelinsky municipal district of the Republic of Tatarstan". Stabilization of subgrade soil with lime.

07/07/2018

Menzelinsky Branch

Site “Reconstruction of the auto road “M-7 “Volga” – Noviy Melken in Menzelinsky municipal district of the Republic of Tatarstan". Construction of the asphalt-concrete surface course.

07/04/2018

Suburban Branch

Construction of base course of porous coarse-grained asphalt-concrete mix on site “Reconstruction of the auto road Sokury-Kirbi-Travkino, part km 5+000 – km 6+000 in Laishevsky municipal district of the Republic of Tatarstan".

07/04/2018

Suburban Branch

Construction of surface course of macadam-and-sand mix on site “Construction of Access road to Bolshoy Pochinok village in Vysokogorsky municipal district of the Republic of Tatarstan".

07/04/2018

Nizhnekamsky Branch

Workers of the company conduct construction of the road upper layer of dense asphalt-concrete mix type B on site “Access road to non-commercial allotment gardens “Veteran”, “Sputnik”, “Energetik-1”, allotments “Kama-2”, “Kama”, “Teploenergostroy”, “Stroitel”, “City non-commercial allotment of Nizhnekamsk”, gardening cooperative “Sadovod-NK”, gardening consumer’s cooperatives “Neftekhimik”, “Shinnik” in Nizhnekamsky municipal district of the Republic of Tatarstan”.

07/02/2018

Construction of asphalt bedding course is conducted on site “Reconstruction of the auto road “Kazan-Ulyanovsk” – Staroye Drozhzhanoye, part km 7+000 – km 9+248” in Drozhzhanovsky municipal district of the Republic of Tatarstan.

06/29/2018

Suburban Branch

Construction of leveling course, milling of asphalt-concrete surface on site “Reconstruction of the auto road Kazan-Malmyzh, part km 19+320 – km 21+920 in Vysokogorsky municipal district of the Republic of Tatarstan".

06/29/2018

Suburban Branch

Construction of macadam-and-sand mix (grade 10) surface course on the auto road Stolbistche-Atabayevo, part km 6+000 – km 9+000 in Laishevsky municipal district of the Republic of Tatarstan.

06/29/2018

Suburban Branch

Construction of surface course and strengthening of slopes with macadam on the auto road “M-7 “Volga” – Kulayevo-Pestretsy, part km 0+000 – km 1+600 and km 2+100 – km 4+346 in Pestrechinsky municipal district of the Republic of Tatarstan.

06/29/2018

Nizhnekamsky Branch

Construction of surface course of asphalt-concrete (macadam-and-mastics, grade 10) jn site “Reconstruction of the asphalted road network in the inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (reconstruction of the auto road on Muradyan street from “Shifaly” bus stop to Krasniy Kliuch settlement).

06/29/2018

Mamadyshsky Branch

Construction of the earth bed on site “Reconstruction of the auto ro ad “Uzyak-Alga_Petrovsky” in Tiulyachinsky municipal district of the Republic of Tatarstan".

06/29/2018

Nizhnekamsky Branch

Workers of the company conduct construction of the racking course of porous asphalt-concrete mix on site “Access road to non-commercial allotment gardens “Veteran”, “Sputnik”, “Energetik-1”, allotments “Kama-2”, “Kama”, “Teploenergostroy”, “Stroitel”, “City non-commercial allotment of Nizhnekamsk”, gardening cooperative “Sadovod-NK”, gardening consumer’s cooperatives “Neftekhimik”, “Shinnik” in Nizhnekamsky municipal district of the Republic of Tatarstan”.

06/29/2018

Road bed construction works using cold recycling method with addition of aggregate are finished on site: “Reconstruction of the auto road “Kazan-Ulyanovsk” – Staroye Drozhzhanoye, part km 0+442 – km 2+353” in Buinsky municipal district of the Republic of Tatarstan.

06/29/2018

Recycling works (with addition of binding and soil stabilization with lime) are finished on site: “Reconstruction of the auto road “Kazan-Ulyanovsk” – Staroye Drozhzhanoye, part km 7+000 – km 9+248” in Drozhzhanovsky municipal district of the Republic of Tatarstan.

06/29/2018

Nizhnekamsky Branch

Workers of the company are mowing the grass off the auto roads in Nizhnekamsky municipal district of the Republic of Tatarstan.

06/29/2018

Аrsky Branch

Summer season auto road maintenance works in Arsky municipal district of the Republic of Tatarstan.

06/27/2018

Aksubaevsky Branch

Workers of the company conduct construction of the upper surface layer made of macadam-and-mastics asphalt (grade 20) on the auto road Kuzaykino-Nurlat (part km 22+725 – km 24+420, stage 2) in Cheremshansky municipal district of the Republic of Tatarstan.

06/25/2018

Menzelinsky Branch

Works on site “Reconstruction of the auto road M-7 “Volga” – Staroye Aymanovo – Oktyabr, part Tatarskoye Bulyarovo-Urazmetyevo, in Musliumovsky municipal district of the Republic of Tatarstan". Workers of the company construct bedding course of the asphalt-concrete surface and foundation pit for the pipe.

06/21/2018

Suburban Branch

Site “Construction of the auto road Access to Bolshoy Pochinok village in Vysokogorsky municipal district of the Republic of Tatarstan". Stabilization and strengthening of the soil on site with lime.

06/21/2018

Reconstruction of the road network in Alyoshkin Saplyk inhabited locality in Drozhzhanovsky municipal district of the Republic of Tatarstan have been successfully finished.

06/20/2018

Nizhnekamsky Branch

In accordance with the program “Reconstruction of the road network in the inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan", workers of the company conduct construction of asphalt-concrete mix surface (type B-2) bedding in Blagodatnoye village (Mir street).

06/20/2018

Suburban Branch

Construction of the road bed on the auto road Rybnaya Sloboda-Yanchikovo is conducted in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

06/20/2018

Workers of the company conduct bedding construction using cold recycling method with addition of aggregate on site “Reconstruction of the auto road “Kazan-Ulyanovsk”-Staroye Drozhzhanoye, part km 7+000 – km 9+248 in Drozhzhanovsky municipal district of the Republic of Tatarstan.

06/19/2018

Reconstruction of the asphalt-concrete surface at Vakhitov avenue in Naberezhnye Chelny city.

06/19/2018

Suburban Branch

Improvement of the territory of production base of Suburban branch, Usady settlement, Laishevsky municipal district of the Republic of Tatarstan. Construction of leveling and surface courses.

06/19/2018

Suburban Branch

Construction of dense asphalt-concrete mix (type B, grade 2) leveling course on the auto road Stolbistche-Atabayevo, part km 6+000 – km 9+000 in Laishevsky municipal district of the Republic of Tatarstan.

06/19/2018

Suburban Branch

Milling of the asphalted surface on the auto road Kazan-Malmyzh, part km 19+320 – km 21+920 in Vysokogorsky municipal district of the Republic of Tatarstan.

06/19/2018

Suburban Branch

Workers of the company mow the grass off with tractor-mounted mowing machines and trimmers.

06/19/2018

Apastovsky Branch

Construction of mass concrete foundation for the shell of reinforced concrete pipe on site “Reconstruction of the auto road Tetiushi-Kamskoye Ustye, km 2+300 – km 11+800 (stage IV: km 9+855 – km 11+843) in Tetiushsky municipal district of the Republic of Tatarstan”.

06/08/2018

Suburban Branch

Our workers continue construction of the road bed on site “Construction of the auto road Access to Bolshoy Pochinok village in Vysokogorsky municipal district of the Republic of Tatarstan”.

06/08/2018

Suburban Branch

On photo: milling of the asphalt-concrete surface on the auto road Stolbistche-Atabayevo, part km 6+000 – km 9+000 in Laishevsky municipal district of the Republic of Tatarstan”.

06/08/2018

Nizhnekamsky Branch

Final stage of construction works on site “Reconstruction of the asphalted road network in the inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan“ (auto road to the City hall of records, Akhtubinskaya street 6B).

06/08/2018

Menzelinsky Branch

On photo: site “Reconstruction of the auto road M-7 “Volga” – Staroye Aymanovo – Oktyabr, part Tatarskoye Bulyarovo – Urazmetyevo in Musliumovsky municipal district of the Republic of Tatarstan“. Workers of the company conduct construction of cement-bound macadam-and-sand road bed.

06/01/2018

Menzelinsky Branch

Workers of the company construct upper layer of the road surface on site “Reconstruction of the asphalted road network of the inhabited localities in Aktanyshsky municipal district of the Republic of Tatarstan“.

06/01/2018

Nizhnekamsky Branch

Workers of the company construct auto road base course of solid asphalt-concrete (B2 type) on site “Reconstruction of the asphalted road network in inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (reconstruction of the auto road at Muradyan street from “Shifaly” bus stop to Krasniy Kliuch settlement)”.

05/31/2018

Suburban Branch

Clean-up after the windstorm of May 30, 2018 in Laishevsky municipal district of the Republic of Tatarstan.

05/31/2018

Suburban Branch

Workers of the company conduct earth bed construction works on site “Construction of the auto road Access road to Bolshoy Pochinok village in Vysokogorsky municipal district of the Republic of Tatarstan.

05/30/2018

Sabinsky Branch

Reconstruction of worn-out asphalt-concrete surfaces is conducted on the auto road “Bypass of Bogatye Saby settlement” using the funds provided for road maintenance in Sabinsky municipal district of the Republic of Tatarstan.

05/29/2018

Mamadyshsky Branch

Workers of the company conduct road works on site “Reconstruction of asphalted road network in inhabited localities of Mamadyshsky municipal district of the Republic of Tatarstan”.

05/28/2018

Аrsky Branch

Workers of Arsky branch of the company had started construction of the asphalt-concrete surface on site “Reconstruction of the road network in the inhabited localities of Arsky municipal district of the Republic of Tatarstan”.

05/25/2018

Menzelinsky Branch

Reconstruction of worn-out asphalt-concrete surfaces is conducted on the auto road “Bypass Menzelinsk city” using the funds provided for road maintenance in Menzelinsky municipal district of the Republic of Tatarstan.

05/24/2018

Apastovsky Branch

Workers of the company conduct summer maintenance works on the auto roads in Verkhneuslonsky, Kaibitsky and Tetiushsky municipal districts of the Republic of Tatarstan.

05/24/2018

Suburban Branch

Summer maintenance works on the regional and federal public auto roads in Vysokogorsky, Pestrechinsky and Laishevsky municipal districts of the Republic of Tatarstan.

05/23/2018

Apastovsky Branch

Workers of the company conduct construction of the upper layer made of asphalt-concrete mix (grade 10) on site “Reconstruction of the auto road M-7 “Volga” – Vvedenskaya Sloboda, part km 0+000 – km 3+500 in Verkhneuslonsky municipal district of the Republic of Tatarstan”.

05/18/2018

Suburban Branch

Workers of the company conduct construction of the leveling course made of porous fine-grained asphalt-concrete mix (grade 2) on site “Reconstruction of the auto road Rybnaya Sloboda – Yanchikovo in Rybno-Slobodsky municipal district of the Republic of Tatarstan (stage 2)”.

05/08/2018

Apastovsky Branch

Workers of the company conduct bedding construction works using cold recycling method with addition of mineral aggregate and construction of compact coarse-grained mix (type BM II) base course on site “Reconstruction of the auto road M-7 Volga – Vvedenskaya Sloboda, km 0+000 – km 3+500” in Verkhneuslonsky municipal district of the Republic of Tatarstan.