May - September 2017

May - September 2017

09/30/2017

09/30/2017

Apastovsky Branch

Workers of the company install road signs and remove mud from gutters as part of maintenance works on federal auto roads in Verkhneuslonsky municipal district of the Republic of Tatarstan.

09/30/2017

Apastovsky Branch

Maintenance works on territorial auto roads in Verkhneuslonsky municipal district of the Republic of Tatarstan are going on.

09/30/2017

Apastovsky Branch

“Burunduky” production base in Drozhzhanovsky municipal district of the Republic of Tatarstan is under construction.

09/30/2017

Apastovsky Branch

Strengthening of roadsides with macadam on site “Reconstruction of the auto road “Buinsk-Yalchik”-Novye Chechkaby – Kyr Tavgildino, km 2+950 – km 4+450” in Buinsky municipal district of the Republic of Tatarstan.

09/30/2017

Apastovsky Branch

Construction of car parking for workers of “Verkhneuslonsky” maintenance depot in front of the production base.

09/29/2017

Aksubaevsky Branch

The works are finished on site “Reconstruction of the road network of inhabited localities of Aksubayevsky municipal district of the Republic of Tatarstan”(road surfacing of intermediate type).

09/29/2017

Aksubaevsky Branch

The works are finished on site “Reconstruction of asphalted road network of inhabited localities of Aksubayevsky municipal district of the Republic of Tatarstan”.

09/28/2017

Suburban Branch

Construction (1st stage) of road bedding course of enriched macadam-and-sand mix with addition of concrete using reclaimer-mixer on site “Reconstruction of the auto road Rybnaya Sloboda-Yanchikovo” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

09/26/2017

Apastovsky Branch

Grading of slopes on site “Reconstruction of the auto road “Buinsk-Yalchik-Novye Chechkaby – Kyr Tavgeldino, km 2+950 – km 4+450” in Buinsky municipal district of the Republic of Tatarstan.

09/25/2017

Apastovsky Branch

Drain strengthening with macadam, construction of roadsides and grading of slopes on site “Reconstruction of the auto road Ulanovo-Tenky, km 2+000 – km 7+200” in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan.

09/25/2017

Apastovsky Branch

Works are finished on site “Reconstruction of the auto road “Kazan-Ulyanovsk – Staroye Baryshevo – Kamskoye Ustye” – Malye Burtasy in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan.

09/25/2017

Menzelinsky Branch

Workers of the company are finishing strengthening of roadsides with macadam on site “Reconstruction of the auto road Aktanysh-Poisevo, km 29+904 – km 37+760” in Aktanyshsky municipal district of the Republic of Tatarstan.

09/23/2017

Menzelinsky Branch

Strengthening of slopes and bed on site “Construction of the auto road “Drive to Mryasevo inhabited locality” in Aktanyshsky municipal district of the Republic of Tatarstan.

09/22/2017

Apastovsky Branch

Workers of the company are finishing construction works on site “Reconstruction of the auto road “Tetiushi – Kamskoye Ustye”, km 16+700 – km 22+380 in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan.

09/22/2017

Apastovsky Branch

“Burunduky” production base in Drozhzhanovsky municipal district of the Republic of Tatarstan is under construction.

09/20/2017

Suburban Branch

Construction (1st stage) of macadam-and-sand paving on site “Reconstruction of the auto road Rybnaya Sloboda-Yanchikovo” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

09/20/2017

Suburban Branch

Milling of old paving on site “Reconstruction of the auto road “Kazan-Shemordan” –Yambulat, km 2+000 – km 4+000” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

09/19/2017

Suburban Branch

Shaping and strengthening of roadsides on site “Reconstruction of the auto road “M-7 “Volga” – Kutlu Bukash –Rybnaya Sloboda” –Troitsky Uray – Gremyachka, km +000 – km 2+550” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

09/18/2017

Suburban Branch

Milling of old paving and construction of leveling course (reconstruction of worn-out layers) on site “Reconstruction of the auto road Kazan-Malmyzh, km 41+800 – km 49+270” in Vysokogorsky municipal district of the Republic of Tatarstan.

09/11/2017

Menzelinsky Branch

Reconstruction of the auto road “Musliumovo-Staroye Saitovo” – Turush (1st stage) in Musliumovsky municipal district of the Republic of Tatarstan.

09/09/2017

Аrsky Branch

Workers of the company are finishing construction works on site “Construction of the auto road Komorguzya – Novaya Iulba” in Atninsky district of the Republic of Tatarstan.

09/08/2017

Аrsky Branch

Ground stabilization with lime is finished on site “Reconstruction of the auto road Noviy Kiner – Noviy Ashit in Arsky district of the Republic of Tatarstan”.

09/08/2017

Menzelinsky Branch

09/08/2017

Suburban Branch

09/07/2017

Suburban Branch

09/05/2017

Apastovsky Branch

Landscaping works are finished successfully on site “Reconstruction of the auto road Tetiushi – Kamskoye Ustye, km 7+780 – km 9+855” in Tetiushsky municipal district of the Republic of Tatarstan.

09/05/2017

Apastovsky Branch

Construction of “Burunduky” production base in Drozhzhanovsky branch of JSC “Tatavtodor” is going on.

09/04/2017

Apastovsky Branch

Workers of the company conduct summer maintenance works on the public federal auto roads in Verkhneuslonsky municipal district of the Republic of Tatarstan. On photo: replacement of metal barrier railings, grass mowing.

08/31/2017

Suburban Branch

Workers of the company stabilize soil with lime and construct road surface of macadam-and-sand mix on site “Reconstruction of the auto road Rybnaya Sloboda – Yanchikovo (1st stage)” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

08/31/2017

Suburban Branch

Construction of the base course on site “Reconstruction of the auto road “Kornoukhovo-Novaya Yrga – hetnevo – Tulushi “ – Shetnevo-Cheremyshevo” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

08/31/2017

Suburban Branch

Workers of the company conduct strengthening of the drain ditches with mass concrete and roadsides with macadam and granular asphalt guttings on site “Reconstruction of the auto road Kazan – Shemordan, km 25+700-km 26+793, km 37+210-km 40+517”in Pestrechinsky municipal district of the Republic of Tatarstan.

08/29/2017

Apastovsky Branch

Improvement of production base of “Tetiushsky” maintenance depot of Apastovsky branch of JSC “Tatavtodor”.

08/29/2017

Apastovsky Branch

Patching of asphaltic surface on the auto road “Kazan – Ulyanovsk-Staroye Baryshevo-Kamskoye Ustye” in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan.

08/28/2017

Apastovsky Branch

Summer maintenance works are continued on federal and regional public auto roads in Verkhneuslonsky and Tetiushsky municipal districts of the Republic of Tatarstan.

08/25/2017

Asphalt surface coat had been successfully laid on the auto road “Staroye Drozhzhanoye – Karakityan – Shlanga, km 6+200 – km 9+500” in Drozhzhanovsky municipal districts of the Republic of Tatarstan.

08/22/2017

Apastovsky Branch

Regeneration of asphalt-concrete surface on site “Reconstruction of the auto road “Buinsk-Yalchik”-Novye Chechkaby-Kyr Tavgeldino, km 2+950-km 4+450” in Buinsky municipal district of the Republic of Tatarstan.

08/21/2017

Apastovsky Branch

Workers of the company apply vertical marking, install metal barrier railing, strengthen the roadsides with macadam and grade the slopes on site “Reconstruction of the auto road Kazan-Ulyanovsk-Kamskoye Ustye, km 15+200 -km22+000” in Verkhneuslonsky municipal district of the Republic of Tatarstan.

08/18/2017

Laying of asphalt-concrete surface is finished on site “Reconstruction of asphalted road network in inhabited localities of Drozhzhanovsky municipal district of the Republic of Tatarstan”( Staroye Drozhzhanoye settlement, Lenina street; Nizhneye Chekurskoye settlement, Drive to “Chaika” children’s health camp).

08/15/2017

Workers of the company stabilize soil with lime on site “Reconstruction of the auto road “Staroye Drozhzhanoye – Tatarskiye Shatrashany”, km 11+000 – km 13+000 (stage 1: km 11+000 – km 12+800)” in Drozhzhanovsky municipal district of the Republic of Tatarstan.

08/11/2017

Suburban Branch

Workers of the company conduct reconstruction of worn-out layers on the auto road “Kazan-Borovoye Matiushino, km 25+175 (km 9+575) – km 27+375 (km 11+775)” in Laishevsky municipal district of the Republic of Tatarstan.

08/04/2017

Mamadyshsky Branch

Workers of the company conduct reconstruction work on site “Reconstruction of the auto road “Mamadysh – Kukmore” – Klyaush – Komarovka” in Mamadyshsky municipal district of the Republic of Tatarstan.

08/02/2017

Sabinsky Branch

Workers of the company reconstruct worn-out road surface on the auto road “Bogatye saby-Leskhoz, km 0+000-km14+445” in Sabinsky municipal district of the Republic of Tatarstan.

08/01/2017

Suburban Branch

Workers of the company conduct summer road maintenance works on the regional public auto roads in Pestrechinsky municipal district of the Republic of Tatarstan.

07/31/2017

Suburban Branch

Summer maintenance works in progress on regional public auto roads in Laishevsky municipal district of the Republic of Tatarstan.

07/31/2017

Menzelinsky Branch

Works in progress on site “Construction of the auto road “Drive to settlement Mryasevo” in Aktanyshsky municipal district of the Republic of Tatarstan”.

07/31/2017

Menzelinsky Branch

Works in progress on site “Reconstruction of the auto road “M-7 “Volga” – Noviy Melken” in Menzelinsky municipal district of the Republic of Tatarstan”.

07/29/2017

Menzelinsky Branch

Works in progress on site “Reconstruction of the auto road “Musliumovo-Staroye Saitovo” – Turush: 2nd stage” in Musliumovsky municipal district of the Republic of Tatarstan”.

07/28/2017

Suburban Branch

Works in progress on site “Reconstruction of the auto road “Kazan-Malmyzh”, km 17+800-km 19+520 in Vysokogorsky municipal district of the Republic of Tatarstan”.

07/27/2017

Suburban Branch

Summer maintenance works in progress on regional public auto roads in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

07/27/2017

Suburban Branch

Works in progress on site “Reconstruction of the auto road Sokuri-Kirby-Travkino, km 6+000-km 9+073 in Laishevsky municipal district of the Republic of Tatarstan”.

07/26/2017

Suburban Branch

Summer maintenance works in progress on regional public auto roads in Vysokogorsky municipal district of the Republic of Tatarstan.

07/26/2017

Suburban Branch

Reconstruction of the auto road “Kornoukhovo-Novaya Yrga-Shetnevo-Tulushi”-Shetnevo-Cheremyshevo in Rybno-Slobodsky municipal district of the Republic of Tatarstan”.

07/25/2017

Aksubaevsky Branch

Aksubayevskybranch Construction of asphalt-concrete 6 cm surface made of porous coarse grained asphalt-concrete M-II mix on the auto road Kuzaykino-Nurlat-Cheremshan, km 6+780 – km 13+765 (II stage: km 10+085 – km 11+545) in Cheremshansky district of the Republic of Tatarstan.

07/24/2017

Mamadyshsky Branch

Mamadyshskybranch Workers of the company continue summer road maintenance works on the public federal and regional auto roads in Mamadyshsky municipal district of the Republic of Tatarstan.

07/21/2017

Аrsky Branch

Arsky branch Laying of asphalt-concrete mixes is finished on site “Reconstruction of asphalted road network in regional centers and cities in Tulyachinsky district of the Republic of Tatarstan”.

07/20/2017

Aksubaevsky Branch

Aksubayevskybranch Construction of asphalt-concrete 6 cm surface made of porous coarse grained asphalt-concrete M-II mix on the auto road Chistopol-Aksubayevo-Nurlat, km 62+000 – km 69+657 in Aksubayevsky district of the Republic of Tatarstan.

07/17/2017

Apastovsky Branch

Workers of the company conduct summer maintenance works on public regional auto roads in Apastovsky, Kamsko-Ustyinsky, Kaibitsky and Verkhneuslonsky municipal districts of the Republic of Tatarstan.

07/15/2017

Apastovsky Branch

Construction of the road base using cold recycling method, strengthening of beds of reinforced concrete pipe (d=1,5 m) inlet and outlet, construction of asphalt bedding course on site “Reconstruction of the auto road “Kazan-Ulyanovsk” – Kamskoye Ustye, km 15+200 - km 22+500" in Verkhneuslonsky municipal district of the Republic of Tatarstan.

07/14/2017

Apastovsky Branch

Construction of asphalt surface course on site “Reconstruction of asphalted road network in inhabited localities of Kamsko-Ustyinsky municipal district of the Republic of Tatarstan” is going on.

07/13/2017

Mamadyshsky Branch

Construction of the auto road “Liuga-Nyrtinsky farm –Knya Bash” in Kukmorsky municipal district of the Republic of Tatarstan is going on.

07/12/2017

Menzelinsky Branch

Reconstruction of the auto road “Aktanysh-Poisevo, km 29+904 - km 37+760" in Aktanyshsky municipal district of the Republic of Tatarstan.

07/11/2017

Apastovsky Branch

Stabilization of soil with lime and construction of new pavement on site “Reconstruction of the auto road Tetiushi – Kamskoye Ustye, km 2+300 - km11+800 (3rd stage, km 7+780-km 9+855)”in Tetiushsky municipal district of the Republic of Tatarstan.

07/11/2017

Menzelinsky Branch

Workers of the company conduct summer maintenance works on the regional and federal public auto roads in Menzelinsky municipal district of the Republic of Tatarstan.

07/05/2017

Menzelinsky Branch

Construction of the auto road “Drive to Mryasevo settlement” in Aktanyshsky municipal district of the Republic of Tatarstan.

07/03/2017

Workers of the company conduct summer road maintenance works on the regional public auto roads in Drozhzhanovsky branch of the Republic of Tatarstan.

06/30/2017

Nizhnekamsky Branch

The works are being finished on site “Reconstruction of asphalted road network in inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (Nizhnekamsk city, Byzova street).

06/29/2017

Аrsky Branch

Construction of road basement using cold regeneration method with addition of macadam and bonding and construction of asphalt bedding course are finished on site “Reconstruction of the auto road Arsk-Tiulyachi, km 0+000 – km 3+500 in Arsky municipal district of the Republic of Tatarstan”.

06/28/2017

Аrsky Branch

Worksunderfederalprogram: constructionofsandsubgradeandmacadam (grade 20-70 class 1000) on site“Reconstruction oftheautoroadNovyKiner-NizhnyayaUra-KzylYarinArskymunicipaldistrictoftheRepublicofTatarstan”.

06/27/2017

Aksubaevsky Branch

Construction of road ground base on the auto road Aksubayevo-Yemelkino, km 16_700 – km 24+100 in Aksubayevsky municipal district of the Republic of Tatarstan”.

06/26/2017

Suburban Branch

Liming on the new part of road surface on site “Reconstruction of the auto road Kazan-Shemordan, km 25+700 – km 26+793, km 37+210 – km 40+517 in Pestrechinsky municipal district of the Republic of Tatarstan”.

06/23/2017

Suburban Branch

Reconstruction of the auto road “Drive to quay Rybnaya Sloboda, km 0+000 – km 1+988 in Rybno-Slobodsky municipal district of the Republic of Tatarstan” (surface constructed with macadam-and-mastics grade 10).

06/19/2017

Apastovsky Branch

Construction of the upper layer of small-grade asphalt-concrete mix (type БМ II) on site “Reconstruction of the auto road Ulanovo-Ten’ky, km 2+000 – km 7+200 in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan”.

06/19/2017

Apastovsky Branch

Workers of the company continue summer road maintenance works on public regional and federal auto roads in Buinsky municipal district of the Republic of Tatarstan.

06/18/2017

Apastovsky Branch

Preparation of macadam-and-sand mix road base, construction of asphaltic surface on site “Reconstruction of asphalted road network in inhabited localities of Kamsko-Ustyinsky municipal district of the Republic of Tatarstan”.

06/15/2017

Apastovsky Branch

Workers of the company continue summer road maintenance works on regional and federal auto roads in Verkhneuslonsky municipal district of the Republic of Tatarstan.

06/14/2017

Apastovsky Branch

Construction of the road base using cold recycling method with addition of macadam (M800 grade 20-70), construction of mass concrete base for the reinforced concrete pipe (d=1,0 m) on site “Reconstruction of the auto road Tetiushi-Kamskoye Ustye, km 2+300 – km 11+800 (3rd stage, km 7+780 – km 9+855) in Tetiushsky municipal district of the Republic of Tatarstan”.

06/13/2017

Suburban Branch

Road maintenance on territorial auto roads in Laishevsky district of the Republic of Tatarstan: macadam and mastic surface (grade 10) on the auto road “Kazan-Orenburg” – Borovoye Matiushino”, km 1+435 – km 2+350”.

06/12/2017

Construction of the subgrade of porous coarse-grained asphalt-concrete on site “Reconstruction of the auto road “Staroye Drozhzhanoye-Karakityan” – Shlanga, km 6+200 – km 9+550 in Drozhzhanovsky municipal district of the Republic of Tatarstan”.

06/08/2017

Apastovsky Branch

Repair of cracks in the asphaltic surface with bituminous sealing compound BRIT on regional public auto roads in Tetiushsky municipal district of the Republic of Tatarstan.

06/08/2017

Aksubaevsky Branch

Reconstruction of worn-out surfaces with macadam and mastic (grade 10)on the auto road “Azeyevo-Cheremshan-Shentala, km 63+224 – km 65+040” in Cheremshansky municipal district of the Republic of Tatarstan.

06/07/2017

Apastovsky Branch

Workers of the company conduct summer road maintenance works on public regional auto roads in Kaibitsky municipal district of the Republic of Tatarstan.

06/06/2017

Menzelinsky Branch

Auto road maintenance in Aktanyshsky and Menzelinsky districts of the Republic of Tatarstan.

06/01/2017

Аrsky Branch

The workers of the company mow the grass off the slopes and roadsides on the regional public roads in Arsky district of the Republic of Tatarstan.

05/31/2017

Menzelinsky Branch

Construction of asphalt-concrete surface on site “Reconstruction of asphalted road network of inhabited localities in Aktanyshsky municipal district of the Republic of Tatarstan”.

05/30/2017

Suburban Branch

Construction of ground base on site “Reconstruction of the auto road “Kornoukhovo-Novaya Yrga-Shetnevo-Tulushi” – Shetnevo-Cheremyshevo” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

05/30/2017

Suburban Branch

Reconstruction of worn-out surfaces on site “Auto road Kazan-Shemordan, km 16+305 – km 17+150, km 22+944 – km 23+674” in Pestrechinsky municipal district of the Republic of Tatarstan.

05/30/2017

Suburban Branch

Reconstruction of worn-out surfaces on site “Auto road Stolbistche -Atabayevo, km 5+000 – km 6+000, km 10+000-km 11+000” in Laishevsky municipal district of the Republic of Tatarstan.

05/30/2017

Suburban Branch

Reconstruction of worn-out surfaces on site “Auto road Kazan-Borovoye Matiushino, km 17+963 – km 19+063 “ in Laishevsky municipal district of the Republic of Tatarstan.

05/30/2017

Suburban Branch

Construction of subgrade using cold recycling method with addition of macadam and bonding on site “Reconstruction of the auto road M-7 “Volga” – Kutlu Bukash – Rybnaya Sloboda – Troitsky Urai – Gremyachka, km 0+000 – km 2+550” in Rybno-Slobodsky municipal district of the Republic of Tatarstan.

05/28/2017

Apastovsky Branch

05/27/2017

Aksubaevsky Branch

Auto road maintenance on regional public roads in Aksubayevsky district of the Republic of Tatarstan.

05/26/2017

Apastovsky Branch

05/26/2017

Аrsky Branch

05/26/2017

Apastovsky Branch

Construction of asphalt-concrete upper layer on site “Reconstruction of asphalted road network in inhabited localities of Apastovsky district of the Republic of Tatarstan”.

05/26/2017

Apastovsky Branch

Workers of the company construct the road bed using cold recycling method on the auto road Kazan-Ulyanovsk-Kamskoye Ustye (km 15+200 – km 22+500) in Verkhneuslonsky district of the Republic of Tatarstan.

05/25/2017

Sabinsky Branch

Workers of the company carry out reconstruction works on site “Reconstruction of the auto road “Timershik-Bol’shoy Shinar” (km 1+371 – km 4+071) in Sabinsky municipal district of the Republic of Tatarstan.

05/25/2017

Sabinsky Branch

Construction of asphalt-concrete upper layer on site “Reconstruction of worn-out layers on the auto road “Kazan-Shemordan” – Kuyuk (km 0+051 – km 4+235) in Sabinsky municipal district of the Republic of Tatarstan.

05/24/2017

Nizhnekamsky Branch

Reconstruction of road network (intermediate type of road surface) in settlement Tashlyk, Nizhnekamsky municipal district of the Republic of Tatarstan.

05/24/2017

Nizhnekamsky Branch

Reconstruction of asphalted road network in inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (Byzov street).

05/23/2017

Аrsky Branch

Macadam-and-mastics asphaltic mix (grade 10) is laid on site “Reconstruction of worn-out layers on the auto road Kazan-Malmyzh, km 66+300-67+700”.

05/22/2017

Apastovsky Branch

Workers of the company carry out construction of asphalt bedding course on site “Reconstruction of the auto road Karatun-Cheremshan-Bolshoye Podberyezye, parts: km 22+140 –24+800, km 24+800 – 28+000, drive to village Kargala (stage 1).

05/22/2017

Apastovsky Branch

Summer maintenance works are continued on regional and federal auto roads in Verkhneuslonsky district of the Republic of Tatarstan.

05/22/2017

Mamadyshsky Branch

Workers of the company carry out reconstruction of worn-out layers of asphalt-concrete on the public federal auto road M-7 “Volga” on the following parts: km 904+900 – km 906+000, km 916+700 – km 916+800, km 918+050 – km 922+500, km 924+400 – km 925+900.

05/20/2017

Stabilization of soil with lime on site “Reconstruction of road network in inhabited localities of Drozhzhanovsky municipal district of the Republic of Tatarstan (intermediate type of road surface)”, Drive to children’s health camp “Chayka”.

05/19/2017

Suburban Branch

Workers of the company carry out reconstruction of worn-out layers on the auto road Kazan-Borovoye Matiushino (km 17+963 – km 17+063) in Laishevsky district of the Republic of Tatarstan.

05/19/2017

Suburban Branch

Horizontal road marking is being striped on regional public auto roads in Laishevsky district of the Republic of Tatarstan.

05/18/2017

Suburban Branch

Cleaning of the barrier railings on regional public auto roads in Laishevsky district of the Republic of Tatarstan.

05/17/2017

Apastovsky Branch

Workers of the company continue construction of road surface on site “Reconstruction of asphalted road network in inhabited localities of Apastovsky district of the Republic of Tatarstan (settlement of Karatunsky cereal receiving point, Zur Uram street).

05/12/2017

Apastovsky Branch

Workers of the company carry out reconstruction of worn-out layers of asphalt-concrete on the auto road Ulanovo-Karatun (km 1+738 – km 2+293) in Verkhneuslonsky district of the Republic of Tatarstan.

05/12/2017

Apastovsky Branch

Construction of inner driveways on the territory of “Tetiushsky” maintenance depot in Apastovsky branch of JSC “Tatavtodor”

05/11/2017

Suburban Branch

New equipment for spray injection pothole repair MADPATCHER MPA 6.5 W by Madrog was introduced in Chirpovsky maintenance depot. With the help f this new equipment the workers conduct pothole repair on the public federal auto road Kazan-Orenburg.

05/05/2017

Menzelinsky Branch

Reconstruction of worn-out surface on the auto road “Menzelinsk-Russkiy Karan-Togashevo” on km 2+370 – km 5+370 in Menzelinsky municipal district of the Republic of Tatarstan.