May - July 2013

31.07.2013

Suburban Branch

Construction of the reinforced concrete pipe on site “Reconstruction of the auto road “Rybnaya Sloboda – Yanchikovo” in Rybno-Slobodsky district of the Republic of Tatarstan.

31.07.2013

Sabinsky Branch

Construction of the asphalt surface course on site “Reconstruction of the auto road “Timershik – Bolshoy Shinar”, km 4+200 – km 11+200, in Sabinsky district of the Republic of Tatarstan.

30.07.2013

Chelninsky Branch

Construction of the macadam road bed and asphalt bedding course on site “Construction of the auto road “Buraly – Rantamak” – Aleksandrovka” – Almetievsk – Musliumovo” – Tatarskiye Karamaly” in Sarmanovsky district of the Republic of Tatarstan.

28.07.2013

Mamadyshsky Branch

Construction of the auto road “Ishkeyevo – Taveli – Chaksy”. The construction of double-course asphalt pavement layers here is finished. Slopes and road sides are being filled in and easement areas are being re-cultivated.

25.07.2013

Apastovsky Branch

Reconstruction of the auto road “Kazan-Uliyanovsk” – Kamskoye Ustie” – Varvarino, km 0+000 – km 3+000 in Kamsko-Ustiynsky district of the Republic of Tatarstan is finished.

25.07.2013

Apastovsky Branch

Reconstruction of the auto road “Sobolevskoye – Chulpanikha” in Verkhne-Uslonsky district of the Republic of Tatarstan is finished.

24.07.2013

Menzelinsky Branch

The part of the auto road “Musliumovo – Saklov Bash – Yultimirovo”, km 1+600 – km 5+800 in Musliumovsky district of the Republic of Tatarstan is put into operation after reconstruction.

22.07.2013

Аrsky Branch

Laying of the asphalt surface course on site “Constuction of the auto road Nizhnyaya Korsa – Verkhnyaya Korsa in Arsky district of the Republic of Tatarstan”.

19.07.2013

Menzelinsky Branch

Auto road “Musliumovo – Saklov Bash – Yultimirovo”, km 1+600 – km 5+800 in Musliumovsky district of the Republic of Tatarstan 4.2 km long is being prepared for commissioning.

17.07.2013

Aksubaevsky Branch

Macadam road bed and asphalt bedding course above it are being constructed on the auto road “Chistopol-Aksubayevo-Nurlat”-Chuvashskoye Yenoruskino in Aksubayevsky district of the republic.

17.07.2013

Aksubaevsky Branch

Auto road “Aksubayevo-Yemel’kino”-Russkaya Kiremet’ in Aksubayevsky district of the Republic of Tatarstan. Here, asphalt wearing course was already laid and soft verges were padded. Pipe protecting works are going on.

17.07.2013

Menzelinsky Branch

Earth roadbed is being constructed on the auto road on site “M-7 – Volga” – Novyi Mel’ken” in Menzelinsky district of the Republic of Tatarstan.

16.07.2013

Aksubaevsky Branch

On photo: Auto road “Chistopol-Aksubayevo-Nurlat”-Chuvashskoye Yenoruskino”-Ilyashkino in Aksubayevsky district of the Republic of Tatarstan. Synthetic non-woven fabric “Dornit-2” is being laid on km 9+000 – km 12+20, sand-and-gravel mix bedding course is being constructed. Protective works on ferroconcrete culvert d 2x2 m on km 20+95 are finished.

16.07.2013

Mamadyshsky Branch

Protective works on I/O pads of the pipes are being finished. Macadam roadbed is being constructed; asphalt bottom and surface course are being laid on auto road “Ishkeevo – Nizhniy Takanysh – Chaksy” in Mamadyshsky district of the Republic of Tatarstan.

16.07.2013

Chelninsky Branch

Sand subsoil and macadam roadbed are being constructed and geogrid is being laid on site “Construction of the auto road “Buraly Rantamak” – Aleksandrovka – Al’metyevsk – Musliumovo” – Tatarskiye Karamaly” in Sarmanovsky district of the Republic of Tatarstan.

15.07.2013

Menzelinsky Branch

Subsoil is being constructed on site “Reconstruction of the auto road Tiukovo-Tatarskiye Yamaly, part km 17+550 – 21+000 in Aktanyshsky district of the Republic of Tatarstan”.

13.07.2013

Sabinsky Branch

Laying out the grade and slopes of the embankment on site “Reconstruction of the auto road Timershik – Bol’shoy Shinar, km 0+000 – km 1+371; km 4+200 – km 11+200 in Sabinsky district of the Republic of Tatarstan”.

12.07.2013

Apastovsky Branch

On photo: Construction of the road bed using cold regeneration method with addition of bonding on site “Bypass of settlement Bolshiye Kaibitsy” in Kaibitsky district of the Republic of Tatarstan.

12.07.2013

Drozhzhanovsky Branch

Asphalt bottom course is being finished on auto road Staroye Drozhzhanoye – Karakityan km 7+800 – km 1+056.

11.07.2013

Suburban Branch

Macadam roadbed is being constructed and geogrid is being laid on site “Reconstruction of the auto road “Kazan-Orenburg” – Rybnaya Sloboda – Kornoukhovo” – Bolshoy Oshnyak – Malyi Oshnyak” in Rybno-Slobodsky district of the Republic of Tatarstan.

11.07.2013

Suburban Branch

Construction of the earth roadbed is being finished; subsoil is being spread and geogrid is being laid on site “Reconstruction of the auto road “M-7 “Volga” – Pervoye Maya – Kamysh in Pestrechinsky district of the Republic of Tatarstan.

11.07.2013

On photo: Public road maintenance: grass mowing on roadsides and slopes, patching repair using jet injection method with БЦМ machines, cracks rehabilitation.

07.07.2013

Nizhnekamsky Branch

Ground works are going on, subsoil and macadam road bed are being constructed on the auto road “Menzelinsk-Russkiy Karan-Togashevo-Kuzembetyevo”-Yamakovo in Menzelinsky district of the Republic of Tatarstan.

05.07.2013

Аrsky Branch

Base course of the driveway of asphalt-concrete is being laid after scraping on the auto road “Kazan-Malmyzh” in Baltasinsky district of the Republic of Tatarstan.

05.07.2013

Аrsky Branch

Ground works are going on and subsoil is being constructed on site “Reconstruction of the auto road Arsk-Bolshaya Atnya km 27+600 – km 29+000 in Atninsky district of the Republic of Tatarstan.

05.07.2013

Mamadyshsky Branch

Construction of engineering structures and earth roadbed is being finished on auto road Ishkeevo-Nizhniy Takanysh-Chaksy.

04.07.2013

Menzelinsky Branch

On photo: Ceremony of commissioning of the auto road “Aktanysh-Poisevo”-Kuziyakino” 6.0 km long in Aktanyshsky district of the Republic of Tatarstan.

04.07.2013

Menzelinsky Branch

On photo: Site “Musliumovo – Saklov Bash – Yultimirovo” in Musliumovsky district of the Republic of Tatarstan”. Construction of asphalt-concrete wearing course 4.2 km long is finished, and strengthening of the slopes and channel of water conduit pipe is going on.

04.07.2013

Mamadyshsky Branch

Construction of asphalt-concrete wearing course is finished on the auto road M-7 “Volga”-Urazbakhtino.

04.07.2013

Menzelinsky Branch

Auto road earth bed is being constructed on site “Reconstruction of the auto road Tiukovo-Tatrskiye Yamaly, part km 17+550 – 21+000 in Aktanyshsky district of the Republic of Tatarstan”.

04.07.2013

Nizhnekamsky Branch

Auto road earth bed is being constructed on the auto road “Menzelinsk-Russkiy Karan-Togashevo-Kuzembetyevo”, part Kuzembetyevo-Kadryakovo.

04.07.2013

Aksubaevsky Branch

On photo: Auto road “Aksubayevo-Yemel’kino”- Russkaya Kiremet’ in Aksubayevsky district of the Republic of Tatarstan – construction of the road mat, foundation for water pipe conduit and asphalt covering.

22.06.2013

Drozhzhanovsky Branch

The road bed is being constructed on the auto road Staroye Drozhzhanoye – Karakityan using “mix-in-place” method (Gravel-sand + bonding).

22.06.2013

Drozhzhanovsky Branch

Roadbed side cutting is being planned on site Reconstruction of the road “Tsivilsk-Uliyanovsk”-Khornovar-Shigali, km 0+014 – km 5+207 in Drozhzhanovsky district of the Republic of Tatarstan.

21.06.2013

Аrsky Branch

Construction of the bottom layer is going on on site “Construction of the auto road Nizhnyuaya Korsa – Verkhnyaya Korsa in Arsky district of the Republic of Tatarstan”.

21.06.2013

Suburban Branch

On photo: Reconstruction of Tatarstan Street in Kazan - construction of the racking course.

21.06.2013

Suburban Branch

On photo: Reconstruction of Fuchika Street in Kazan - construction of the surface course.

18.06.2013

Aksubaevsky Branch

Site: “Construction of the auto road “Chistopol’ -Aksubayevo-Nurlat”- Chuvashskoye Yenoruskino”- Ilyashkino in Aksubayevsky district of the Republic of Tatarstan”. Construction of the road bed is going on. The steel concrete water 2x2 m pipe conduit was mounted, now the joints are being sealed. Protective works are started.

17.06.2013

Menzelinsky Branch

Construction of macadam roadbed on site “Reconstruction of the auto road Drive to settlement Barsukovo in Aktanyshsky district of the Republic of Tatarstan”.

16.06.2013

Suburban Branch

Milling, leveling and macadam and mastic asphalt concrete courses construction and installation of guard rails on drive to international airport of Kazan.

15.06.2013

Aksubaevsky Branch

Construction of the road bed on the auto road “Chistopol’ -Aksubayevo-Nurlat”- Chuvashskoye Yenoruskino”. Sand and gravel bedding course and M-400 macadam road bed are being made here. Installation of headwalls and sections of the steel concrete water Ø1.5 m pipe conduit is finished and waterproofing works are started.

14.06.2013

Menzelinsky Branch

Roadside soil stabilization on the auto road “Aktanysh – Poisevo – Kuziyakino” in Aktanyshsky district of the Republic of Tatarstan”.

13.06.2013

Menzelinsky Branch

ЩМА-15 macadam and mastics asphalt concrete carpet coat is being made on the auto road “Musliumovo – Saklov Bash – Yultimirovo” in Musliumovsky district of the Republic of Tatarstan”.

13.06.2013

Drozhzhanovsky Branch

On photo: Road surface regeneration works (first trip of the recycler) on the auto road Staroye Drozhzhanoye – Karakityan km 7+800 – km 16+056 in Drozhzhanovsky district of the Republic of Tatarstan.

11.06.2013

Mamadyshsky Branch

The works on site “Mamadysh-Tiuliyach-Vasil’yevo” are finished. Ground works are being executed on sites “Ishkeyevo-Nizhniy Takanysh-Chaksy” and “Usali-Albayevo-Vladimirovo”.

05.06.2013

Apastovsky Branch

Earth roadbed is being stabilized with lime on site “Normalization of road network in village Dolgaya Polyana”.

04.06.2013

Аrsky Branch

Ground works are being executed on site “Constuction of the road Nizhnyaya Korsa – Verkhnyaya Korsa in Arsky district of the Republic of Tatarstan”.

01.06.2013

Menzelinsky Branch

Site: Construction of the auto road “Almetyevsk – Musliumovo – Igenche” in Musliumovsky district of the republic. Ground bed of the auto road is being made here.

01.06.2013

Apastovsky Branch

On photo: Construction of the road bed on the auto road “Kazan-Uliyanovsk”-Staroye Baryshevo-kamskoye Ustiye-Yasashno-Baryshevo.

01.06.2013

Apastovsky Branch

Cold regeneration method is being used to construct road bed on the auto road “Ulanovo-Karatun”- B. Kaybitsy, km 0+150 – km 8+300.

01.06.2013

Menzelinsky Branch

On photo: Site “Aktanysh-Poisevo”-Kuziyakino” in Aktanyshsky district of the Republic of Tatarstan. Asphalt-concrete surface course is being laid here.

01.06.2013

Menzelinsky Branch

Site: Reconstruction of the auto road Drive to settlement Barsukovo in Aktanyshsky district of the Republic of Tatarstan. On photo: Construction of the road bed of the auto road.

01.06.2013

Chelninsky Branch

Construction of the auto road “M-7 Volga”- Kutlu Bukash – Rybnaya Sloboda – Bikchurayevo” in Rybno-Slobodsky district of the Republic of Tatarstan is going on.

18.05.2013

Sabinsky Branch

Laying of the asphaltic mastic macadam (ЩМА-15) carpet coat on site “Reconstruction of the auto road “Sardek Bash – Lel’vidj – settlement Chura” on part km 0+000 – km 4+250 in Kukmorsky district of the Republic of Tatarstan.

18.05.2013

Mamadyshsky Branch

The earth roadbed is finished and the bottoming and macadam foundation are being finished on the auto road “Mamadysh-Tiuliyachi-Vasil’yevo”.

13.05.2013

Suburban Branch

On photo : Ground works on site “Kazan-Orenburg-Rybnaya Sloboda-Kornoukhovo-Bolshoy Oshnyak-Maliy Oshnyak”.

07.05.2013

Nizhnekamsky Branch

Scraping works are finished on Zakiyev str. in Kazan.

02.05.2013

Suburban Branch

On Pushkin str. in Kazan the workers of the branch are scraping the road and laying the racking course.