May - July 201207/28/2012 Menzelinsky Branch The precommissioning is going on on site “Reconstruction of the auto road Aktanysh-Musliumovo km 63+100 – km 66+200; km 81+630 – km 83+130 in Muslumovsky district of the Republic of Tatarstan”. At the same time, on the site the slopes are being outlined with slope bucket of Volvo excavator and roadside slopes are stabilized with macadam, and pipe culvert streambeds and slants are covered with concrete. 07/28/2012 Menzelinsky Branch Site “Reconstruction of the auto road “M-7 Volga” Staryi Irkenyash – Tatarskaya Mushuga”, part Kzyl Tiubyak to village Yelgabash. The excavations are going on on the part of the auto road from Tatarskaya Mushuga to Village Yelgabash (auto road #2 3.8 km long). Earth bed, soil stabilization with lime and macadam road bed works are made on the part of the road from village Kzyl Tiubyak to Tatarskaya Mushuga (auto road #1 7.3 km long). 07/27/2012 Аrsky Branch The reclamation and making of the road bed on the 1st part (km 0+00 – 24+50) of the site “Reconstruction of the auto road Ashitbash-Shushmabash-Karaduvan, km 6+500 – 12+500 in Arsk district of the Republic of Tatarstan”. 07/26/2012 Nizhnekamsky Branch Preparations for water pipe construction (microtunnel method) on the auto road “Naberezhnye Chelny-Zainsk-Almetyevsk”. 07/26/2012 Nizhnekamsky Branch Making of the asphalt-concrete layer on the auto road “Naberezhnye Chelny-Zainsk-Almetyevsk”. 07/25/2012 Mamadyshsky Branch Laying of the bottom layer on the auto road “Usali-Albayevo”. 07/25/2012 Nizhnekamsky Branch Making of the asphalt-concrete layer on the auto road “Sheremetevka-Karmaly”. 07/19/2012 Аrsky Branch Rectangular section water pipe construction on km 17+79 of the auto road “Mamadysh-Tulyachi” on km 76+100 – 78+100 in Tulyachinsky district of the republic. 07/17/2012 Mamadyshsky Branch Auto road “Mamadysh-Tulyachi”, km 68+00-108+00. Excavation on the drive to the settlement Verkhnyaya Oshma, and excavation and border levee on km 91+00 – 108+00 of the main road are going on. The double-layer asphalt-concrete coating is laid on the drive to the settlement Khafizovka km 2.5 and exit to settlement Verkhnyaya Oshma km 1.1. The roadsides are filled-in with ground layer and the slopes are being planned. 07/16/2012 Аrsky Branch On the site “Reconstruction of the auto road “Arsk-Tulyachi” on km 19+100 – 31+200” the roadsides are being stabilized with macadam. 07/14/2012 Aksubaevsky Branch “Reconstruction of the auto road Nizhnyaya Karmalka – Sheshminskaya Krepost in Cheremshansky district of the Republic of Tatarstan” site. Shored up ditches are being made for water piping ø1.5 m. 07/14/2012 Mamadyshsky Branch The auto roads “Mamadysh-Kukmor-Klaush-Shadchi” – 3.6 km, "Mamadysh-Kukmor-Klaush-Shadchi-Yamashevo” – 4.2 km, "Mamadysh-Kukmor-Klaush-Shadchi-Novoye Mochalkino-Staroye Mochalkino” – 2.9 km are almost ready to be accepted by State Acceptance Commission. 07/14/2012 Suburban Branch Macadam roadbed on the site “M-7 “Volga” – Kutlu Bukash- Rybnaya Sloboda, km 27+450 – 34+550 in Rybno-Slobodsky district of the Republic of Tatarstan” is being made. 07/14/2012 Aksubaevsky Branch Auto road “Chistopol – Aksubayevo – Nurlat” km 55+000 – 62+000 in Aksubayevsky district of the republic is being covered with upper coating of ÙÌÀ -15 4 cm thick. 07/13/2012
Geogrid MacGrid 20S is being laid on the site “Normalization of the road network in inhabited locality Suly-Saklovo in Sarmanovsky district of the Republic of Tatarstan”. 07/11/2012 Suburban Branch Liming (stiffening) of the road bed is going on on site “M-7 “Volga”- Kutlu Bukash- Rybnaya Sloboda, km 27+450-km 34+550 in Rybno-Slobodsky district of the Republic of Tatarstan” . 07/09/2012
Making of macadam roadbed using 3D leveling on site “Access to Kama settlement in Tukayevsky district of the Republic of Tatarstan”. 07/09/2012
Making of concavity on site “Access to Kama settlement in Tukayevsky district of the Republic of Tatarstan”. 07/06/2012 Mamadyshsky Branch Planning of the slopes on high borders using grading bucket on Volvo excavator on the auto road “Mamadysh-Kukmor-Klaush-Yamashevo”. 07/05/2012 Apastovsky Branch “Normalization of road net in Maloye Shemyakino” site in Tetiushsky district of the republic. On photo: making of the bottom layer of the road, making of the pavement. For details please read “Avangard” newspaper of July 05, 2012. 07/04/2012 Apastovsky Branch Making of the base layer of sand, planning and stiffening of road bed on site “Ulanovo-Karatun”-B. Kaybitsy, site Sredny Biyabash-Ebalakovo in Kaybitsky district of the republic. 07/04/2012 Apastovsky Branch Making of the covering layer of ÙÌÀ-15 asphalt-concrete on site “Kazan-Ulyanovsk”-Staroye Baryshevo-Kamskoye Ustye” km 5+950 – km 7+220 in Apastovsky district of the republic. 07/04/2012 Apastovsky Branch Site “Kazan-Ulyanovsk”-Staroye Baryshevo-Kamskoye Ustye” –Almanderovo-Malye Bolgoyary km 0+000 – km 4+230; km 8+170 in Apastovsky district of the republic”. Making of the road bed using cold regeneration method (first pass). 07/04/2012 Menzelinsky Branch As quickly as possible the work for making the asphalt-concrete layer at the total area of 21,000 sq.m at the site “Bringing in correspondence to Norms the condition of routes and streets at township Aktanysh” in Aktanysh district of Tatarstan Republic. 07/03/2012 Sabinsky Branch Work is being done at the site “Reconstruction of Cartodrome ‘Argamak’ at town Bogatye Saby” in Sabinsky district of Tatarstan Republic. Work for making the two-layer foundation of broken rock is finished; making of asphalt-concrete coating soon will be finished. 07/02/2012 Suburban Branch Work is started for regeneration of the existing coating at the site “Repair of motor road at the approach to town Laishevo, km 10+600 – km 14+883” in Laishevsky district of Tatarstan Republic. 07/01/2012 Suburban Branch Work for overhaul repair of Salimzhanova st. at the portion from Esperanto st. to Pushkin st. at city Kazan. Work is being performed at the night time only. 06/30/2012 Apastovsky Branch Work for restoration of worn-out coating for the whole width of roadway with the help of BOMAG asphalt-laying machine and GRABER thermal bunker for transportation of asphalt-concrete mix. 06/30/2012 Apastovsky Branch Creation of upper layer of coating of broken rock – mastic asphalt concrete (ÙÌÀ-15 brand) at the site “Apastovo-Tetiushy” km 2+100 – km 3+300, km 5+900 – km 7+400 in Apastovsky district of Tatarstan Republic. 06/30/2012 Suburban Branch Work is being finished for reinforcement of waysides with broken rock at the site “Repair of motor road Kazan – Borovoye Matiushino, km 4+200 – km 9+560” in Laishevsky district of Tatarstan Republic. 06/28/2012 Aksubaevsky Branch One-layer asphalt-concrete coating is made of type BM-2 asphalt concrete mix at the site “Repair of motor road Russkaya Kiremet’ – Industrial’ny” in Aksubaevsky district of Tatarstan Republic. 06/27/2012 Аrsky Branch Making of asphalt-concrete coating at the accesses of motor road “Arsk - Tiulyachi” with the help of thermal bunker installed by Graber Baumaschinen (Switzerland) on the MAN truck. 06/27/2012 Sabinsky Branch Repair work is finished and put into service the section of motor road “Kazan – Shemordan”, km 85+969 – km 90+400 in Sabinsky district of Tatarstan Republic. The length of section – 4.431 km. Coating type ÙÌÀ – 15. 06/27/2012
Destructurization of concrete foundation using vibroresonance technique with the help of concrete-breaker RB-500 (USA make) by the contractor “BAV Ltd” (Moscow) at the approach to settlement Kama in Tukaevsky district of Tatarstan Republic. 06/26/2012 Nizhnekamsky Branch Making of leveling layer of black broken rock at the motor road “Sheremet’evka - Karamaly”, km 0+000 – km 1+500; km 2+500 – km 3+000; km 5+812 – km 6+912; km 7+700 – km 11+800 in Nizhnekamsk district of Tatarstan Republic. Pothole repair work is performed at the motor road Chistopol’ – Nizhnekamsk – Karamaly. 06/26/2012 Mamadyshsky Branch While servicing the motor roads bushes are cut and shredded with the help of MIDIFORST L-175 device, grass is cut at waysides by tractor-mounted mowers MACCONEL ÐÀ 55 ÅÑÎ and SEPPi M SMG PRO 175. 06/23/2012 Аrsky Branch The laying of the upper layer of asphalt-concrete coating of B type mark II at the site “Motor road Arsk – Border of Mariy-El Republic, km 38+200 – km 40+750” in Arsky district of Tatarstan Republic. 06/22/2012 Aksubaevsky Branch Site at motor road “Chistopol’ – Aksubaevo – Nurlat – Chuvashskoe Enoruskino - Tarkhanka” in Aksubaevsky district of Tatarstan Republic. Formwork for catch-water well is made at the end of drain-pipe D=1.5 m. 06/22/2012 Аrsky Branch At the site Highway M-7 “Volga” – Saush – Shadky – Sharmashy in Tiulyachinsky district excavation is performed and 45 meter bridge is being built by “Gidromontazh Ltd.” 06/21/2012 Menzelinsky Branch Motor road section “Aktanysh – Poisevo – Kuyanovo – Azyakul’, km 3+770 – km5+300” (length 1.53 km) in Aktanyshsky district of Tatarstan Republic in put into service. 06/21/2012 Menzelinsky Branch At the site Highway M-7 “Volga” – Stariy Irkenyash – Tatarskaya Mushuga the work is being performed for making the substrate layer of sand-gravel mix, then broken-rock foundation, and also planning the waysides with grader machine. At the site Highway M-7 “Volga” – Stariy Irkenyash – Tatarskaya Mushuga, at the approach to village Elgabash of Muslyumovsky district of Tatarstan Republic the work is being performed for making the roadbed, pits for pipe culverts. Workers of Branch laboratory perform operational check of the roadbed quality with the help of electronic dynamic densitometer ZORN ZFG – 3000 (Germany make). 06/21/2012 Suburban Branch Put into service section of the motor road “Laishevo - Chirpy”, km 1+325 – km 2+285 in Laishevsky district of Tatarstan Republic. 06/20/2012 Apastovsky Branch Construction of the road bed on site “Kazan-Uliyanovsk”-Staroye Baryshevo-Kamskoye Ustie 5+950 km – 7+220 km” in Apastovsky district of the Republic of Tatarstan. 06/16/2012 Apastovsky Branch “Normalization of the road net in populated locality Maloye Shemyakino” in Tetushskiy district of the republic. Laying of the bottom course on the access track. 06/16/2012
The works are going on on the auto road “Kazan-Ulyanovsk” – Staroye Drozhzhanoye on 40+300 km – 46+340 km in Drozhzhanovsky district of the republic. There, the leveling blanket of asphalt-concrete is being laid and slopes of the earth bed are being planned. 06/15/2012 Apastovsky Branch Excavations are going on on site “Ulanovo-Karatun”-Bolshiye Kaibitsy, on the part Sredniy Biyabash-Ebalakovo” in Kaibitsky district of the Republic of Tatarstan. 06/14/2012 Aksubaevsky Branch The road bed is being made on site "Chistopol-Aksubayevo-Nurlat”-Chuvashskoye Yenoruskino-Tarkhanka in Aksubayevo district of the republic. Monolith foundation under pipe body d 1,5 m at km 67+86. 06/10/2012 Apastovsky Branch The auto road “Karatun-Cheremshan-Bolshoye Podberezye” on 0+000 km – 3+695 km in Apastovsky district of the republic is being reconstructed. On photo:
06/09/2012 Mamadyshsky Branch The asphalt-concrete coating of the auto road “Mamadysh-Kukmore-Klyaush-Shadchi-Yamashevo” was laid. Now, roadsides are being stabilized with M-400 stone fragments on the auto road “Mamadysh-Kukmor-Klyaush-Shadchi”. 06/08/2012 Aksubaevsky Branch The bottom layer of asphalt-concrete coating is ready on road construction site “Azeevo-Cheremshan-Shentala”-Novoye Ibraykino in Aksubayevsky district of the republic of Tatarstan. 06/08/2012 Аrsky Branch The asphalt-concrete ÙÌÀ-15 top coat has been laid on the auto road “Arsk-Tuliachi km 19+100 – km 31+200. 06/08/2012 Mamadyshsky Branch The following works were executed on the auto road “Mamadysh-Kukmor-Klyaush-Shadchi-Novoye Mochalkino-Staroye Mochalkino”:
06/08/2012 Apastovsky Branch Making of foundation layer using cold regeneration method (second pass) on the auto road “Apastovo-Tetiushi” km 2+100 – km 3+300 and km 5+900 – km 7+400 in Apastovsky district of the Republic of Tatarstan. 06/07/2012 Suburban Branch Road milling works were started on site “Kazan-Borovoye Matiushino, km 4+200- km 9+560” in Laishevo district of the Republic of Tatarstan. 06/05/2012
Assembling of the pipe culvert on site “Reconstruction of the auto road M-7 “Volga”-Naberezhnye Chelny-Water intake-s. Novyi” in Tukaevsky district of the Republic of Tatarstan. 05/30/2012 Аrsky Branch Earth bed set-up and soil stabilization with caustic lime on site “Arsk-Mari El Republic limits, km 38+200-km 40+750” in Arsky district of the Republic. 05/29/2012 Suburban Branch Road marking with polyurethane 3M STAMARK tape on the auto road Arsk-Tiuliachi, km 19+100-km 31+200 in Tiulyachinsky district of the Republic. 05/28/2012 Menzelinsky Branch Assembling of the pipe culvert on the auto road Aktanysh-Muslumovo, km 81+630-83+130 in Muslumovo district of the Republic of Tatarstan. 05/26/2012 Menzelinsky Branch The excavation is going on at site “M-7 “Volga” – Stary Irkenyash-Tatarskaya Mushuga” in Menzelinsky district of the Republic. 05/26/2012 Aksubaevsky Branch Normalizing of road and street network in village Staroye Mokshino in Aksubaevsky district of the Republic. 05/26/2012
The grass is being cut on the roadsides, slopes and easement areas with tractor-mounted mower ÐÀ55 ÅÑÎ («MACCONEL»). 05/25/2012 Mamadyshsky Branch The upper layer is being put on the auto road “Usali-Albayevo” in Mamadyshsky district of Tatarstan. 05/24/2012 Menzelinsky Branch Soil stabilization on site “Menzelinsk-Russky Karan-Torgashevo-Kuzembetyevo” on the section Naratly-Kichu – Kodryakovo. 05/24/2012 Aksubaevsky Branch The excavations are going on at site “Russkaya Kiremet-Industrialny” in Aksubaevsky district of Tatarstan. 05/22/2012
The pipe culvert is being mounted on site “Kazan-Uliyanovsk-Staroye Drozhzhanoye, km 40+300-46+340” in Drozhzhanovsky district of Tatarstan. 05/18/2012 Menzelinsky Branch The workers of Menzelinsky branch are preparing to completion the rebuilt part of the auto road Aktanysh-Poisevo, km 9+840-13+440 in Aktanyshsky district of the Republic of Tatarstan. 05/16/2012 Mamadyshsky Branch The making of the road bed on the auto road “Mamadysh-Kukmor-Klyaush-Shadchi-Yamashevo” in Mamadyshsky district of Tatarstan. 05/15/2012 Mamadyshsky Branch The base layer is being put on the auto road “Mamadysh-Kukmor-Klyaush-Shadchi-Staroye Mochalkino” in Mamadyshsky district of Tatarstan. |