August - September 2016

30.09.2016

Menzelinsky Branch

Suface layer of asphalt-concrete is constructed on site “Reconstruction of the auto road Aktanysh-Musliumovo, parts km 60+883- km 61+923, km 66+435- km 69+715 in Musliumovsky municipal district of the Republic of Tatarstan (part km 66+435- km 69+715 )”.

29.09.2016

Menzelinsky Branch

Reconstruction of the auto road Musliumovo-Staroye Saitovo, part Semyakovo-Staroye Saitovo in Musliumovsky municipal district of the Republic of Tatarstan”: construction of the bottom layer of asphalt-concrete road surface.

29.09.2016

Menzelinsky Branch

Reconstruction of the auto road “M-7 “Volga” – Novoye Aymanovo-Atryakle-Kaltakovo-Filimonovka”, part “Kaltakovo-Filimonovka” in Menzelinsky municipal district of the Republic of Tatarstan.

27.09.2016

Sabinsky Branch

Road works are conducted on site “Reconstruction of the auto road Bogatye Saby-Timarshik-Verkhniy Simet-Alan, part km 3+500 – km 6+333 In Sabinsky municipal district of the Republic of Tatarstan”.

26.09.2016

Apastovsky Branch

The territory of production base of maintenance depot “Kaibitsky” of Apastovsky branch of JSC “Tatavtodor” is being improved.

26.09.2016

Apastovsky Branch

Planning of the road slopes is conducted on the regional auto road in Kamsko-Ustyinsky district of the Republic of Tatarstan.

26.09.2016

Apastovsky Branch

Summer road maintenance works are fulfilled on the territorial and federal auto roads in Verkhneuslonsky district of the Republic of Tatarstan.

25.09.2016

Apastovsky Branch

Construction of the surface layer of asphalt-concrete on site “Reconstruction of the auto road “Apastovo-Tetiushi”, part km 0+000 – km 0+960 in Apastovsky district of the Republic of Tatarstan”.

25.09.2016

Aksubaevsky Branch

Reconstruction of the auto road “Aksubayevo-Fedorovka”, part km 0+000 – km 1+300 in Aksubayevsky district of the Republic of Tatarstan”: construction of the asphalt-concrete surface with macadam-and-mastics asphalt-concrete (grade 15).

23.09.2016

Apastovsky Branch

Construction of macadam-and-sand mix base course and bedding on site “Reconstruction of the auto road “Ulanovo-Tenki”, part km 2+000 – km 7+200 in Kamsko-Ustyinsky district of the Republic of Tatarstan”.

23.09.2016

Apastovsky Branch

Construction of road topping is finished on site “Tetiushi-Kamskoye Ustye” – inhabited locality Zaton (named after V.V. Kuibyshev) in Kamsko-Ustiynsky district of the Republic of Tatarstan”.

19.09.2016

Аrsky Branch

Construction of the upper layer of asphalt-concrete surface was started on the reconstructed part of the auto road “Arsk-Tiulyachi” (km 0+000 – km 3+500).

16.09.2016

Аrsky Branch

Construction of asphalt-concrete surface is finished on site “Reconstruction of the auto road “Murali-Siza” in Arsky district of the Republic of Tatarstan”.

09.09.2016

Sabinsky Branch

The soil is stabilized with lime on site “Reconstruction of the auto road “Bogatye Saby-Timershik-Verkhniy Simet-Alan”, km 3+500 – km 6+333 in Sabinsky municipal district of the Republic of Tatarstan”.

08.09.2016

Sabinsky Branch

Asphaltic binder is constructed on site “Reconstruction of the auto road “Nyrtinsky farm-Turkash-Novaya Chabya” in Kukmorsky municipal district of the Republic of Tatarstan”.

07.09.2016

Nizhnekamsky Branch

Construction of the asphalt-concrete surface layer is finished on site “Reconstruction of the auto road “Chistopol-Nizhnekamsk”, km 24 – km 26 with a bridge across Tolkishka river in Chistopolsky district of the Republic of Tatarstan”.

06.09.2016

Apastovsky Branch

The soil is stabilized with lime on site “Reconstruction of the auto road “Tetiushi-Kamskoye Ustye”, km 5+500 – km 7+780 in Tetiushsky district of the Republic of Tatarstan”.

05.09.2016

Suburban Branch

Worn-out layers of the auto road surface are reconstructed on the auto road Kinderi-“Krutushka” sanatorium. The funds for this reconstruction were allocated from the road maintenance funds of Vysokogorsky municipal district of the Republic of Tatarstan.

01.09.2016

Aksubaevsky Branch

Asphalt-concrete surface layer was constructed on site “Normalization of the route “Krivoozerki-Novaya Aleksandrovka-Nizhnyaya Balanda” in Aksubayevsky municipal district of the Republic of Tatarstan”.

31.08.2016

Apastovsky Branch

Metal barrier railings were successfully mounted on site “Reconstruction of the auto road “Kazan-Ulyanovsk”-Sobolevskoye, km 8+200- km 11+200 in Verkhneuslonsky district of the Republic of Tatarstan”.

31.08.2016

Apastovsky Branch

Installation of blocked border stones and construction of asphalt-concrete surface layer (grade 20) are finished on site “Reconstruction of the auto road “Kazan-Ulyanovsk”-Kamskoye Ustye, km 15+200- km 22+500 in Verkhneuslonsky district of the Republic of Tatarstan”.

31.08.2016

Aksubaevsky Branch

Cold regeneration of asphaltic surface was started on site “Reconstruction of the auto road “Kuzaikino-Nurlat”, km 22+725 – km 26+355 (Stage 1: km 24+420 – km 26+355) in Cheremshansky municipal district of the Republic of Tatarstan”.

28.08.2016

Menzelinsky Branch

Road bed is being constructed on site “Reconstruction of the auto road “Aktanysh-Musliumovo, km 60+883 – km 61+923, km 61+435-km 69+715 in Musliumovsky municipal district of the Republic of Tatarstan”.

28.08.2016

Suburban Branch

Asphalt-concrete surface is being laid on site “Normalization of road network in settlement Tagashevo in Pestrechinsky municipal district of the Republic of Tatarstan”.

27.08.2016

Suburban Branch

The works are finished on site “Reconstruction of the auto road “Drive to settlement Stolbistche, km 0+560 – km 1+792 in Laishevsky municipal district of the Republic of Tatarstan».

26.08.2016

Aksubaevsky Branch

Construction of asphalt-concrete upper surface (grade 15) on site “Reconstruction of the auto road “Chistopol-Aksubayevo-Nurlat”, km 62+000 – km 69+657 in Aksubayevsky municipal district of the Republic of Tatarstan".

24.08.2016

Apastovsky Branch

Construction of asphalt-concrete bottom layer on site “Reconstruction of the auto road “Drive to village Nizhneye Ozero” in Verkhneuslonsky district of the Republic of Tatarstan» is going on.

24.08.2016

Suburban Branch

The soil is being stabilized with lime on site “Reconstruction of the auto road “Pestretsy-Chita-Yantsevary” – Tolkiyaz in Pestrechinsky municipal district of the Republic of Tatarstan».

24.08.2016

Suburban Branch

The works are finished on site “Reconstruction of the auto road Drive to city Laishevo, km 0+000 – km 7+800 in Laishevsky municipal district of the Republic of Tatarstan».

23.08.2016

Suburban Branch

Worn-out layers of the auto road surface are reconstructed on the auto road Kinderi-“Krutushka” sanatorium. The funds for this reconstruction were allocated from the road maintenance funds of Vysokogorsky municipal district of the Republic of Tatarstan.

23.08.2016

Menzelinsky Branch

Construction of asphalt-concrete bottom layer on site “Reconstruction of the auto road “Musliumovo-Staroye Saitovo”, part “Semyakovo-Staroye Saitovo” in Musliumovsky municipal district of the Republic of Tatarstan» is going on.

23.08.2016

Menzelinsky Branch

The works are carried out on site “Reconstruction of the auto road “Aktanysh-Musliumovo”, km 60+883- km 61+923, km 66+435- km 69+715 in Musliumovsky municipal district of the Republic of Tatarstan».

23.08.2016

Drozhzhanovsky Branch

The soil is being stabilized with lime on site «Reconstruction of the auto road “Staroye Drozhzhanoye – Tatarskiye Shatrashany” – Novye Chukaly, km 0+000 – km 1+100 in Drozhzhanovsky municipal district of the Republic of Tatarstan».

15.08.2016

Apastovsky Branch

Summer road maintenance is carried out on the territorial auto roads in Apastovsky, Verkhneuslonsky and Kaibitsky districts of the Republic of Tatarstan».

13.08.2016

Mamadyshsky Branch

Cold regeneration and asphalt-concrete surface are finished on site “Reconstruction of the auto road Mamadysh-Tiulyachi, km 0+50 – km 2+290 in Mamadyshsky district of the Republic of Tatarstan”.

12.08.2016

Aksubaevsky Branch

Aspahalt-concrete surface layer is being constructed on site “Normalization of the route “Krivoozerki-Novaya Aleksandrovka-Nizhnyaya Balanda” in Aksubayevsky municipal district of the Republic of Tatarstan”.

12.08.2016

Mamadyshsky Branch

Cold regeneration and construction of asphalt-concrete surface is finished on site “Reconstruction of the auto road Kosteneyevo – Kotlovka, km 0+000 - km 2+100 in Yelabuzhsky district of the Republic of Tatarstan».

06.08.2016

Apastovsky Branch

Acceptance and loading of inert materials on quay “Boat yard named after S.M. Kuibyshev” by workers of maintenance depot of Kamsko-Ustiynsky district of the Republic of Tatarstan».

05.08.2016

Apastovsky Branch

Construction of earth bed on site “Reconstruction of the road network in inhabited localities of Kamsko-Ustiynsky district of the Republic of Tatarstan» is going on.

04.08.2016

Аrsky Branch

Asphalt-concrete is laid on site “Reconstruction of the auto road “Arsk-Mari El Republic border” – Chikamas in Arsky municipal district of the Republic of Tatarstan».

03.08.2016

Apastovsky Branch

The road bed is being constructed using cold recycling method on site “Reconstruction of the auto road “Kazan-Ulyanovsk” – Kamskoye Ustye, km 22+500 – 24+084 in Verkhneuslonsky district of the Republic of Tatarstan».

02.08.2016

Menzelinsky Branch

The works are conducted on site “Reconstruction of the auto road Aktanysh-Musliumovo, km 60+883- km 61+923, km 66+435- km 69+715 in Musliumovsky municipal district of the Republic of Tatarstan».

02.08.2016

Drozhzhanovsky Branch

The works are going on on site «Reconstruction of the auto road “Staroye Drozhzhanoye – Tatarskiye Shatrashany”, km 6+600 – km 11+100 in Drozhzhanovsky municipal district of the Republic of Tatarstan».

01.08.2016

Apastovsky Branch

Construction of asphalt-concrete surface is being finished on site “Reconstruction of worn-out surface on the auto road “Buinsk-Tetiushi”, km 21+748-km 27+148 in Tetiushsky municipal district of the Republic of Tatarstan».

01.08.2016

Menzelinsky Branch

Construction of asphalt-concrete upper layer is being finished on site “Reconstruction of the auto road “M-7 “Volga” – Novoye Aymanovo-Atryakle-Kaltakovo-Filimonovka, part “Kaltakovo-Filimonovka” in Menzelinsky municipal district of the Republic of Tatarstan».

01.08.2016

Suburban Branch

Maintenance of auto roads in Laishevsky municipal district of the Republic of Tatarstan is carried out.