August - September 2015

August - September 2015

09/29/2015

Аrsky Branch

The works are going on on site “Reconstruction of the auto road Arsk – Tiulyachi, km 0+000 – km 3+500 in Arsky district of the Republic of Tatarstan”.

09/25/2015

Apastovsky Branch

The works are finished on site “Reconstruction of the auto road “Kazan-Ulyanovsk” – Kamskoye Ustye, km 61+450 – km 66+688 in Kamsko-Ustyinsky district of the Republic of Tatarstan”.

09/23/2015

Apastovsky Branch

Construction of slopes, strengthening of ditches with macadam, installation of metal barrier railing on the auto road Tetiushi – Kamskoye Ustye, km 2+300 – km 11+800 in Tetiushsky municipal district of the Republic of Tatarstan (stage 1: 2+300 – 5+500).

09/23/2015

Aksubaevsky Branch

Reconstruction of the auto road “Aksubayevo-Yemelkino” – Novaya Kiremet in Aksubayevskysky district of the Republic of Tatarstan: construction of asphaltic surface and strengthening of slopes are finished.

09/22/2015

Apastovsky Branch

Construction of the bottom course on the auto road Ulanovo – Tenki, km 2+000 – km 7+200 in Kamsko-Ustyinsky municipal district of the Republic of Tatarstan.

09/22/2015

Apastovsky Branch

The works are finished on the auto road Drive to village Ulanovo in Verkhneuslonsky municipal district of the Republic of Tatarstan.

09/22/2015

Aksubaevsky Branch

“Reconstruction of auto road “Chistopol-Aksubayevo-Nurlat” – Urmandeevo, km 0+000 – km 6+100 in Aksubayevsky district of the Republic of Tatarstan: construction of the bottom course is finished”.

09/21/2015

Aksubaevsky Branch

Construction of the bottom course is finished on site “Reconstruction of the auto road Drive to settlement Tumeykino in Cheremshansky municipal district of the Republic of Tatarstan”.

09/21/2015

Suburban Branch

Reconstruction of worn-our surface layers on the federal public auto road “Kazan-Orenburg”.

09/20/2015

Suburban Branch

Construction of the road formation using cold regeneration method and asphalt bedding course on site “Reconstruction of the intersection off the auto road M-7 “Volga” – Tagashevo to settlement Aryshkhazda and dacha community in Pestrechinsky municipal district of the Republic of Tatarstan”.

09/18/2015

Suburban Branch

Construction of the road formation with enriched sand-and-gravel mix strengthened with concrete on site “Reconstruction of the auto road Kornoukhovo – Novaya Yrga – Shetnevo – Tulushi, part Kornoukhovo – Novaya Yrga (2nd stage) in Rybno-Slobodsky municipal district of the Republic of Tatarstan”.

09/14/2015

Suburban Branch

Construction of “Dubyazy” production base is going on.

09/14/2015

Menzelinsky Branch

Construction of pavement layers on the auto road “Aktanysh – Poisevo” – Bylyak” – Chalmanarat” in Aktanyshsky district of the Republic of Tatarstan.

09/14/2015

Menzelinsky Branch

Planning of the slopes of the earth work, strengthening of the slopes and water pipe beds on site “M-7 “Volga” – Novoye Aymanovo – Atryakle – Kaltackovo – Filimonovka, part “M-7 – Volga” – Stary Irkenyash – Tatarskaya Mushuga – Kaltakovo in Menzelinsky municipal district of the Republic of Tatarstan”. Construction of sand-and gravel roadbed strengthened with concrete is finished.

09/09/2015

Aksubaevsky Branch

Construction of the macadam and sand mix road bed on site “Reconstruction of the auto road Drive to settlement Tuimetkino in Cheremshansky municipal district of the Republic of Tatarstan”.

09/09/2015

Aksubaevsky Branch

Works are finished on site “Reconstruction of the auto road “Chistopol – Aksubayevo – Nurlat” – Kultura in Aksubayevsky municipal district of the Republic of Tatarstan”.

09/09/2015

Apastovsky Branch

Road maintenance in Buinsky and Verkhneuslonsky districts of the Republic of Tatarstan”.

09/08/2015

Apastovsky Branch

The works are finished on site “Reconstruction of the auto road “Tetiushi – Kamskoye Ustye” – Ishimovo in Kamsko-Ustiynsky municipal district of the Republic of Tatarstan”.

09/07/2015

Apastovsky Branch

The works are finished on site “Reconstruction of the auto road “Tetiushi – Bolshiye Tarkhany – Undory – Kashka in Tetiushsky municipal district of the Republic of Tatarstan”.

09/06/2015

Apastovsky Branch

The works are finished on site “Construction of the auto road Arslanovo-Kulaberdino in Kaibitsky municipal district of the Republic of Tatarstan”.

09/05/2015

Apastovsky Branch

The works are finished on site “Reconstruction of the asphalted road network in inhabited localities of Kamsko-Ustiynsky municipal district of the Republic of Tatarstan”.

09/04/2015

Apastovsky Branch

The works are finished on site “Reconstruction of the asphalted road network in inhabited localities of Verkhneuslonsky municipal district of the Republic of Tatarstan”.

09/03/2015

Apastovsky Branch

The works are going on on the auto road “Drive to village Ulanovo in Verkhneuslonsky district of the Republic of Tatarstan”.

09/02/2015

Apastovsky Branch

Construction of asphalt-concrete surface on the territory of production base of “Verkhneuslonsky” maintenance depot.

09/02/2015

Аrsky Branch

The works are being finished on site “Construction of the auto road railroad station Vysokaya Gora – railroad station passing place Kinderi “ in Vysokogorsky district of the Republic of Tatarstan”.

09/01/2015

Apastovsky Branch

The works are going on on site “Reconstruction of the auto road Kazan-Ulyanovsk-Kamskoye Ustye km 15+200 – km 22+500 in Verkhneuslonsky district of the Republic of Tatarstan”.

08/28/2015

Menzelinsky Branch

M-7 “Volga” – Novoye Aymanovo – Atryakle – Kaltakovo – Filimonovka, part “M-7 “Volga” – Stary Irkenyash – Tatarskaya Mushuga – Kaltakovo in Menzelinsky municipal district of the Republic of Tatarstan. Here, we continue construction of the earth bed, and the construction of the base course (sand-and-gravel mix+cement) using mix-in-place method was started.

08/28/2015

Aksubaevsky Branch

Construction of the macadam base course and asphalt binder is being finished on site “Reconstruction of the auto road “Aksubayevo-Yemelkino” – Novaya Kiremet in Aksubayevsky district of the Republic of Tatarstan.

08/27/2015

Nizhnekamsky Branch

Stabilization of earth bed with lime is conducted on site “Reconstruction of the auto road Chistopol – Nizhnekamsk, part km 24 – km 26 with a bridge across river Tolkish in Chistopolsky district of the Republic of Tatarstan.

08/27/2015

Menzelinsky Branch

Construction of the 2.55 km long asphalt surface course on the drive to inhabited locality Russkaya Mushuga.

08/24/2015

Aksubaevsky Branch

Construction of the macadam-and-sand surface course is finished in settlement Staroye ibraykino.

08/24/2015

Nizhnekamsky Branch

Reconstruction of the territory of the Central Republican hospital in city Nizhnekamsk.

08/23/2015

Suburban Branch

The works are going on on site “Construction of the auto road Vysokaya Gora railway station – Kinderi crossing place in Vysokogorsky district of the Republic of Tatarstan”.

08/22/2015

Suburban Branch

Construction of macadam-and-sand mix road course on site “Construction of drive to village Oshnyak-Kachkalak in Rybno-Slobodsky municipal district of the Republic of Tatarstan”.

08/20/2015

Menzelinsky Branch

Construction of road dirt bed and stabilization of ground with lime on site “Reconstruction of the auto road M-7 “Volga” – Staryi Irkenyash- Tatarskaya Mushuga – Kaltakovo in Menzelinsky municipal district of the Republic of Tatarstan”.

08/16/2015

Menzelinsky Branch

Construction of asphalt bedding course on drive to inhabited locality Russkaya Mushuga is finished.

08/16/2015

Menzelinsky Branch

Stabilization of dirt bed with with lime on site “Construction of the auto road “Aktanysh – Musliumovo – Novye Bugady” – Verkhniye Bugady, part Novye Bugady – Verkhniye Bugady in Aktanyshsky municipal district of the Republic of Tatarstan

08/16/2015

Reconstruction of the road network is going on in settlement Staroye Drozhzhanoye. On photo: Pionerskaya str., Zelenaya str.

08/14/2015

Sabinsky Branch

Construction of the upper layer of asphalt-concrete road on site “Reconstruction of the auto road “Bogatye Saby – Leskhoz” – Bolshiye Nyrty – Chabya Churchi in Sabinsky municipal district of the Republic of Tatarstan”.

08/14/2015

Aksubaevsky Branch

On site “Reconstruction of the auto road “Chistopol – Aksubayevo – Nurlat” – Kultura in Aksubayevsky municipal district of the Republic of Tatarstan” the works are going on.

08/12/2015

Suburban Branch

Construction of the foundation course on site “Reconstruction of the auto road Kornoukhovo – Novaya Yrga – Shetnevo – Tulushi, part Kornoukhovo – Novaya Yrga (2nd stage) in Rybno-Slobodsky district of the Republic of Tatarstan”.

08/12/2015

Suburban Branch

Stabilization of the earth bed with lime is made on site “Construction of the drive to village Oshnyak-Kachkalak in Rybno-Slobodsky municipal district of the Republic of Tatarstan”.

08/11/2015

Ground works are being conducted on site “Construction of the auto road Tatarskiye Shatrashany – Ulyanovsk region border in Drozhzhanovsky municipal district of the Republic of Tatarstan”.

08/11/2015

Aksubaevsky Branch

Site “Normalization of road network in inhabitel localities of Aksubayevsky municipal district of the Republic of Tatarstan”, on photo – construction of the road bottom layer in settlement Staroye Ibraikino.

08/11/2015

Mamadyshsky Branch

Construction of pavement layers is being finished on the auto road M-7 “Volga” – Sokolka” – Otarka in Mamadyshsky district of the Republic of Tatarstan.

08/08/2015

Aksubaevsky Branch

Construction of earth road bed on site “Construction of the auto road “Drive to village Kzyl-Chishma” in Cheremshansky municipal district of the Republic of Tatarstan”.

08/08/2015

Mamadyshsky Branch

The works had been successfully finished on the auto road “M-7 “Volga” – Shemorbash – Tavlarovo” in Rybno-Slobodsky district of the Republic of Tatarstan.

08/08/2015

Mamadyshsky Branch

Construction of water pipes had been successfully finished on site “Construction of the auto road “Mamadysh – Kukmor” – Klyaush – Toguz” in Mamadyshsky district of the Republic of Tatarstan.

08/08/2015

Nizhnekamsky Branch

Asphalt-concrete bottom layer is being laid on the auto road Chistopol – Nizhnekamsk. The works are conducted by both Nizhnekamsky and Aksubayevsky branches of JSC Tatavtodor.

08/04/2015

Аrsky Branch

The grass is being mowed on roadsides and slopes of automobile roads.

08/04/2015

Apastovsky Branch

The reconstruction of asphalted road network in inhabited localities of Apastovsky municipal district of the Republic of Tatarstan is finished.

08/03/2015

Apastovsky Branch

The ditches are stabilized with mass concrete on site “Reconstruction of the auto road “Tetuishi- Bolshiye Tarkhany – Undory” – Kashka in Tetiushsky municipal district of the Republic of Tatarstan.

08/01/2015

Аrsky Branch

Road subgrade is being constructed on site “Construction of the auto road “station Vysokaya Gora – station switching track Kindery in Vysokogorsky district of the Republic of Tatarstan”.

08/01/2015

Normalization of the road network of inhabited localities in Tukayevsky district of the Republic of Tatarstan is going on. On photo: village Surovka, settlement Shilnebash, settlement Tatarstan.